Technical Product Manual - DCT1900

Commissioning, Introduction

CHAPTER 1

Introduction

This section describes a series of checks and tests that have to be executed after completing the installation and initialization of the DCT1900 system. The purpose of these tests is to verify that the DCT1900 system is functioning properly after the installation is completed. If it appears that a part is malfunctioning while the system is installed correctly (i.e.: no cabling faults, no configuration faults), the technician must consult Section 7, "Maintenance" included in this manual for fault finding.

Note:

Be sure that all batteries in the Portable Telephones are charged up before executing the tests.

Comm-DCT1900/R8/mw

1-1

© 2000-2005

 

Page 331
Image 331
Nortel Networks DCT1900 manual Commissioning, Introduction