Installation
26975-0055-01-01
Installing the TS400

Overview

This chapter provides detailed information on installing the TS400. The
overall procedure is divided into 11 steps:
1. Designing your installation (page26)
2. Mounting your inverter (page210)
3. Connecting the chassis ground (page211 )
4. Installing the optional S400 Remote Switch
(page 212)
5. Getting ready to connect the DC cables (page214)
6. Routing the DC cables (page215)
7. Connecting the DC cables (page216)
8. Connecting your equipment to the GFCI outlets (page218)
9. Hardwiring the AC output (page219)
10. Performing ch ecks prior to initial start-up (page 222)
11. Testing your installation (page222)

Step 1: Designing Your Installation

Before doing anything else, you need to determine how you are going to
use your TS400, and then design a power system that will give you
maximum performance. The more thorough your planning, the better
your power needs will be met. In particular, you will need to:
Be aware of installation codes
Choose an appropriate location
Calculate your battery requirements and appropriate battery size
Calculate the DC cable size
Select the correct DC fuse and Disconne ct or the DC circuit breaker

Installation Codes

See Installation Codes on page 23 for more information.