Zenoah EXZ2401S manual Operation EX-PS only, EX-PS OP1, English, Checking Oil Supply, Chain oil

Models: EXZ2401S

1 112
Download 112 pages 57.15 Kb
Page 56
Image 56

EX-PS OP1

English

8. Operation (EX-PS only)

CHECKING OIL SUPPLY

After starting the engine, run the chain at medium speed and see if chain oil is scattered off as shown in the figure. (OP1)

(1) Chain oil

NOTE

The oil reservoir has a capacity sufficient to provide about 40 minutes of cutting time (when set to deliver the minimum flow rate, or about as long as you'll get from a tank of fuel). Be sure to refill the oil tank every time when refueling the saw.

ADJUSTING OIL FLOW RATE

WARNING

Never fill the oil reservoir nor adjust the oiler with the engine running.

IMPORTANT

An increase in bar oil flow rate will speed oil consumption, requiring more frequent checks on the oil reservoir. To ensure sufficient lubrication, It may be necessary to check the oil level more frequently than at fuel tank refills.

The guide bar and chain are lubricated automatically by a pump that operates whenever the chain rotates. The pump is set at the factory to deliver a minimum flow rate, but it can be adjusted in the field. A temporary increase in oil flow is often desirable when cutting things like hardwood or wood with a lot of pitch.

56

Page 56
Image 56
Zenoah EXZ2401S manual Operation EX-PS only, EX-PS OP1, English, Checking Oil Supply, Chain oil, Adjusting Oil Flow Rate