Prestige 642 PPPoE Modem

Chapter 2

Hardware Installation & Initial Setup

This chapter describes the physical features of the Prestige and how to make the cable connections.

2.1Front Panel LEDs of the P642

The LED indicators on the front panel indicate the operational status of the Prestige. The table below the figure describes the LED functions:

Figure 2-1 Front Panel of the P642Table 2-1 Front Panel LED Description

LED

COLOR

STATUS

MEANING

PWR

Green

On

Power is applied to the Prestige.

 

 

 

 

SYS

Green

On

The Prestige is on and functioning properly.

 

 

Off

The system is not ready or has malfunctioned.

 

 

Blinking

The system is rebooting.

LAN 10M

Green

On

The Prestige has a successful 10Mb Ethernet connection.

 

 

Blinking

Data is being sent/received.

LAN 100M

Green

On

The Prestige has a successful 100Mb Ethernet connection.

 

 

Blinking

Data is being sent/received.

 

 

 

 

ADSL

Green

On

The Prestige is connected successfully to a DSLAM.

 

 

Off

The link is down.

 

 

Blinking

Data is being sent/received.

 

 

 

 

Hardware Installation & Initial Setup

2-1