
CONTENTS
WATER CHEMISTRY | 2 |
WARNINGS | 4 |
Pay Attention to These Terms | 4 |
RECEIVING EQUIPMENT | 5 |
GENERAL | 5 |
SPECIFICATIONS | |
INSTALLATION | 5 |
Code Requirements | 5 |
Base Installation | 5 |
Clearances | 6 |
Combustion Air (Indoor Units Only) | 6 |
Venting Connections | 7 |
Gas Supply Connections | 8 |
Water Connections | 10 |
CONTROLS | 10 |
Flow Switch | 10 |
Water Pressure Switch | 11 |
Automatic Chlorinators and Chemical | 11 |
Feeders | |
Unitherm Governor Operation | 11 |
Companion Flange Connections | 11 |
(Models | |
Mounting the Poolstat Control with Front- | 12 |
Mounted Loop Using Mounting Slots | |
Mounting Well into System Return Loop | 14 |
Pipe - | |
Piping Configurations for Raytherm | 15 |
Commercial Pool Heaters | |
Piping Configurations for Raytherm | 16 |
Commercial Pool Heaters | |
Piping Configurations for Raytherm | 17 |
Commercial Pool Heaters | |
Temperature Controls | 18 |
External Auxiliary Bypass Valve (Where | 18 |
Required) Models | |
Auxiliary Bypass Valve Adjustment | 18 |
Electrical Wiring | 19 |
Wiring
Wiring
Wiring
Wiring
SERVICING
General Location Of Controls
Temperature Control
Pressure Switch
Pressure Switch Adjustment
Pilot Safety
Before
After
INSPECTION PROCEDURES
Burners
CONTROLS
SERVICING PROCEDURES
Tube Cleaning Procedure (Typical)
Heat Exchanger Reassembly
Burner Drawer Removal
Gas Valve Removal
Main Burner and Orifice Removal
Pilot Removal and Cleaning
Heat Exchanger Removal
Combustion Chamber Removal
Control Well Replacement
Tube Replacement Procedure
Procedure For Cleaning Flue Gas
Passageways
Unitherm Governor Replacement
MAINTENANCE AND CARE
Winterizing Your Heater
TROUBLESHOOTING
WARRANTY
20
21
22
23
24
24
24
24
24
25
25
25
25
25
26
26
26
26
27
27
27
27
27
28
28
28
29
29
29
29
30
30
31
32
35
3