Installation
Preparing for the Installation
Important: Before installing the Long AC Conduit Box, read all instructions and cautionary markings located in this guide and in your inverter manual.
Code Compliance
Governing installation codes vary depending on the location and type of installation. Electrical installations must meet local and national wiring codes. Installations of this equipment should only be performed by skilled personnel such as qualified electricians and Certified Renewable Energy (RE) System Installers. For a list of Xantrex Certified RE dealers, please visit our website at www.XantrexREdealers.com.
Important: Be sure to obtain the appropriate permits, if necessary, prior to starting this installation.
Installation Tools and Materials
Tools Required
Hardware / Materials Required
The following tools may be required for installing this equipment:
❐Wire strippers
❐Assorted
❐Torque wrench
❐Electrical tape
❐Multimeter (AC/DC volts, frequency)
❐Assorted Phillips screw drivers
❐Allen/Hex head driver set
❐Slotted screw driver
❐Level
❐Pencil
❐Utility knife
The following materials may be required for completing this installation:
❐Conduits (flexible conduit is recommended), bushings, wire nuts, and appropriate fittings for wire runs
❐Electrical wire of appropriate size and length
❐Breaker panels (if used)
❐Additional circuit breakers (if required)
❐Ground busses, bars, and/or rods
❐Six appropriately sized wood screws or lag bolts and washers