Xantrex Technology ACCB-L-L1 manual Installation

Page 40

Installation

Optional Field-installed, AC Bus Bar (L2 HOT)

Factory-installed GROUND Wire - Connects to the

SW Plus Inverter #1 GROUND Bar

Field-installed GROUND Wire - Connects to the SW

Plus Inverter #2 GROUND bar*

Factory-installed NEUTRAL Wire - Connects to the

SW Plus Inverter #1 NEU1 terminal

Field-installed NEUTRAL Wire - Connects to SW

Plus Inverter #2 NEU1 terminal*

Factory-installed HOT IN Wire - Connects to the SW

Plus Inverter #1 INV OUT terminal

Factory-installed HOT OUT Wire - Connects to the SW Plus Inverter #1 AC1 GRID or AC2 GEN terminal

ACCB-L2-PCK- Field-installed

AC Bypass Switch Assembly (for Inverter #2) (L2)*

Field-installed HOT Wire - Connects to SW Plus

Inverter #2 INV OUT terminal*

Field-installed HOT Wire - Connects to SW Plus

Inverter #2 AC1 GRID or AC2 GEN terminal*

*Provided with the ACCB-L2-PCK

IMPORTANT: This configuration is created by field- installing an ACCB-L2-PCK into an ACCB-L1. This configuration is not available, fully assembled, from the factory.

Figure 2-13ACCB-L-L1 Internal Components with the Optional ACCB-L2-PKG Installed

2–18

973-0031-01-01 Rev A

Image 40
Contents Sine Wave Plus Long AC Conduit Box Owner’s Guide Page Sine Wave Plus Long AC Conduit Box Date and Revision Purpose ScopeAudience OrganizationAbbreviations and Acronyms Conventions UsedRelated Information Important Safety Instructions Explosive gas precautions CertificationsContents Operation Figures Page Tables Xii Introduction Introduction 1The Sine Wave Plus ACCB-L BasicACCB-L-L1 Specifications ACCB-L ACCB-L-L13ACCB-L Dimensions not to scale AC Bypass Switch Assembly For more information see , Operation in this guideBlockoff Plates 5Blockoff PlatesPage Installation Installation Tools and Materials Preparing for the InstallationCode Compliance Off-Grid Configurations Configuration PlanningOn-Grid Configurations Service Planning Pre-InstallationLocation Ventilation Requirements 12 305 mm Required Shock Hazard Warning Label3Cover Removal and Replacement Removing and Replacing the CoverInstalling or Removing the Blockoff Plates 4The Blockoff Plate on the Long AC Conduit BoxKnockout Preparation 5SW Plus Inverter, AC Side Showing Knockout Location6Knockouts Locations Installing Additional Breakers 7Installing Additional Breakers on the DIN RailMounting Mounting on the Xantrex Back Plate XBP9Installing the ACCB-L on the Backplate Mounting on Plywood To mount the Long AC Conduit Box on plywoodWiring General Wire Sizes and Disconnect Requirements 1Torque Values for Wiring11ACCB-L Approved Internal Components 12ACCB-L-L1 Internal Components Factory installed Installation Wiring for Off-Grid Applications Single Inverter Configurations 120 VacInstallation Step-down Configurations 240 Vac to 120 Vac Installation Step-up Configuration Deep Well Pump 120 Vac to 240 Vac Dual Inverter Configurations 120 Vac and 240 Vac Wiring for On-Grid Applications 20Wiring an On-grid Application Using a Single InverterInstallation Step-up Configurations Utility Backup 120 Vac to 240 Vac Dual Inverter Configurations 120 Vac and 240 Vac Additional Accessory Wiring 24Accessory Wiring for Single-Inverter Configurations25Accessory Wiring for Dual-Inverter Configurations Operation AC Bypass Switch Operating the AC Bypass SwitchNormal Operation Bypass OperationDual Inverters 240 Vac Loads AC Input/Output OffWarranty and Return Information WarrantyProduct DisclaimerExclusions Return Procedure Return Material Authorization PolicyOut of Warranty Service Information About Your System Serial Number Purchased From Purchase DateIndex IX-2 Rev a Page Xantrex Technology Inc