Installation
Installing Additional Breakers
If additional AC circuit breakers are to be installed for specific AC loads or a generator disconnect, then install them per the manufacturer’s instructions on the DIN Rail in the space to the left of the
To install additional
AC Conduit Box:
1.Remove the top cover as described on page
2.Loosen the screw in the DIN Rail End Clamp and slide the clamp away from the existing breaker.
3.Install the circuit breaker(s) on the DIN Rail to the right of the factory- installed AC Bypass Switch. Be sure to align them to fit into the spaces made by the knockouts that were removed on the top cover.
4.Slide the clamp tight against the last circuit breaker on the right and tighten the screw to secure the clamp on the DIN Rail.
DIN Rail End Clamp
DIN Rail
Figure 2-7 Installing Additional Breakers on the DIN Rail
If creating an