Xantrex Technology ACCB-L-L1 manual Installing or Removing the Blockoff Plates

Page 29

Pre-Installation

Installing or Removing the Blockoff Plates

The unit is shipped with both upper and lower blockoff plates installed. If you are installing a single-inverter system, remove the upper blockoff plate only. If you are installing a dual-inverter system, then remove the lower blockoff plate also.

If a TX Autotransformer is to be installed in the lower position, remove the rectangular knockout in the lower blockoff plate. Do not remove the lower blockoff plate from that position.

Store the unused blockoff plates in a safe place, where they can be easily retrieved and reinstalled in the event that the inverter is removed for service.

WARNING: Shock Hazard

Be sure to disconnect all DC and AC power before removing the inverter and installing the blockoff plates.

Align the holes on the Blockoff Plate behind the holes provided from the inside of the ACCB-L chassis.

Secure with the eight 6x32 phillips screws provided.

Torque to 9-10 in-lb.

Figure 2-4The Blockoff Plate on the Long AC Conduit Box

973-0031-01-01 Rev A

2–7

Image 29
Contents Sine Wave Plus Long AC Conduit Box Owner’s Guide Page Sine Wave Plus Long AC Conduit Box Date and Revision Scope PurposeAudience OrganizationRelated Information Conventions UsedAbbreviations and Acronyms Important Safety Instructions Certifications Explosive gas precautionsContents Operation Figures Page Tables Xii Introduction 1The Sine Wave Plus ACCB-L Basic IntroductionACCB-L-L1 ACCB-L ACCB-L-L1 Specifications3ACCB-L Dimensions not to scale For more information see , Operation in this guide AC Bypass Switch Assembly5Blockoff Plates Blockoff PlatesPage Installation Code Compliance Preparing for the InstallationInstallation Tools and Materials On-Grid Configurations Configuration PlanningOff-Grid Configurations Location Pre-Installation Service Planning 12 305 mm Required Shock Hazard Warning Label Ventilation RequirementsRemoving and Replacing the Cover 3Cover Removal and Replacement4The Blockoff Plate on the Long AC Conduit Box Installing or Removing the Blockoff Plates5SW Plus Inverter, AC Side Showing Knockout Location Knockout Preparation6Knockouts Locations 7Installing Additional Breakers on the DIN Rail Installing Additional BreakersMounting on the Xantrex Back Plate XBP Mounting9Installing the ACCB-L on the Backplate To mount the Long AC Conduit Box on plywood Mounting on PlywoodWiring General 1Torque Values for Wiring Wire Sizes and Disconnect Requirements11ACCB-L Approved Internal Components 12ACCB-L-L1 Internal Components Factory installed Installation Single Inverter Configurations 120 Vac Wiring for Off-Grid ApplicationsInstallation Step-down Configurations 240 Vac to 120 Vac Installation Step-up Configuration Deep Well Pump 120 Vac to 240 Vac Dual Inverter Configurations 120 Vac and 240 Vac 20Wiring an On-grid Application Using a Single Inverter Wiring for On-Grid ApplicationsInstallation Step-up Configurations Utility Backup 120 Vac to 240 Vac Dual Inverter Configurations 120 Vac and 240 Vac 24Accessory Wiring for Single-Inverter Configurations Additional Accessory Wiring25Accessory Wiring for Dual-Inverter Configurations Operation Operating the AC Bypass Switch AC Bypass SwitchBypass Operation Normal OperationAC Input/Output Off Dual Inverters 240 Vac LoadsWarranty Warranty and Return InformationExclusions DisclaimerProduct Out of Warranty Service Return Material Authorization PolicyReturn Procedure Serial Number Purchased From Purchase Date Information About Your SystemIndex IX-2 Rev a Page Xantrex Technology Inc