Xantrex Technology ACCB-L-L1 manual Information About Your System

Page 60

Warranty and Return

Information About Your System

As soon as you open your Sine Wave Plus Long AC Conduit Box package, record the following information and be sure to keep your proof of purchase.

Serial Number

_________________________________

Purchased From

_________________________________

Purchase Date

_________________________________

If you need to contact Customer Service, please record the following details before calling. This information will help our representatives give you better service.

Type of installation (e.g. residential, mobile)

__________________________________

Length of time inverter has been installed

__________________________________

Battery/battery bank size

__________________________________

Battery type (e.g. flooded, sealed gel cell, AGM)

__________________________________

DC wiring size and length

__________________________________

Alarm sounding?

__________________________________

Description of indicators on front panel

__________________________________

Appliances operating when problem occurred

__________________________________

Description of problem

__________________________________

______________________________________________________________________________________

______________________________________________________________________________________

WA–4

973-0031-01-01 Rev A

Image 60
Contents Sine Wave Plus Long AC Conduit Box Owner’s Guide Page Sine Wave Plus Long AC Conduit Box Date and Revision Purpose ScopeAudience OrganizationConventions Used Abbreviations and AcronymsRelated Information Important Safety Instructions Explosive gas precautions CertificationsContents Operation Figures Page Tables Xii Introduction Introduction 1The Sine Wave Plus ACCB-L BasicACCB-L-L1 Specifications ACCB-L ACCB-L-L13ACCB-L Dimensions not to scale AC Bypass Switch Assembly For more information see , Operation in this guideBlockoff Plates 5Blockoff PlatesPage Installation Preparing for the Installation Installation Tools and MaterialsCode Compliance Configuration Planning Off-Grid ConfigurationsOn-Grid Configurations Pre-Installation Service PlanningLocation Ventilation Requirements 12 305 mm Required Shock Hazard Warning Label3Cover Removal and Replacement Removing and Replacing the CoverInstalling or Removing the Blockoff Plates 4The Blockoff Plate on the Long AC Conduit BoxKnockout Preparation 5SW Plus Inverter, AC Side Showing Knockout Location6Knockouts Locations Installing Additional Breakers 7Installing Additional Breakers on the DIN RailMounting Mounting on the Xantrex Back Plate XBP9Installing the ACCB-L on the Backplate Mounting on Plywood To mount the Long AC Conduit Box on plywoodWiring General Wire Sizes and Disconnect Requirements 1Torque Values for Wiring11ACCB-L Approved Internal Components 12ACCB-L-L1 Internal Components Factory installed Installation Wiring for Off-Grid Applications Single Inverter Configurations 120 VacInstallation Step-down Configurations 240 Vac to 120 Vac Installation Step-up Configuration Deep Well Pump 120 Vac to 240 Vac Dual Inverter Configurations 120 Vac and 240 Vac Wiring for On-Grid Applications 20Wiring an On-grid Application Using a Single InverterInstallation Step-up Configurations Utility Backup 120 Vac to 240 Vac Dual Inverter Configurations 120 Vac and 240 Vac Additional Accessory Wiring 24Accessory Wiring for Single-Inverter Configurations25Accessory Wiring for Dual-Inverter Configurations Operation AC Bypass Switch Operating the AC Bypass SwitchNormal Operation Bypass OperationDual Inverters 240 Vac Loads AC Input/Output OffWarranty and Return Information WarrantyDisclaimer ProductExclusions Return Material Authorization Policy Return ProcedureOut of Warranty Service Information About Your System Serial Number Purchased From Purchase DateIndex IX-2 Rev a Page Xantrex Technology Inc