Xantrex Technology ACCB-L-L1 manual Index

Page 61

Index

A

abbreviations and acronyms iv AC Bypass Switch Assembly 1–6AC conduit box - Long (ACCB-L)

introduction 1–2specifications 1–4

AC disconnect breakers 1–2AC load breakers 2–10additional accessory wiring 2–29additional breakers in the ACCB-L 2–10Auxiliary Load Module (ALM), wiring for 2–29

B

Blockoff Plates (BP-1) 1–7breakers 1–4

owner-installed 2–10bypass switch 1–6

AC output OFF 3–4bypass operation 3–3

C

Code Compliance 2–2

Customer Service

preparing to call WA–4

E

Emergency Power Off (EPO), wiring for 2–29

G

Generator Start Module (GSM), wiring for 2–29

I

Important Safety Instructions v

Information about Your System form WA–4installation

additional breakers in ACCB-L 2–10codes 2–2

knockout preparation 2–8materials 2–2removing cover 2–6tools 2–2

inverter

purchase date WA–4serial number WA–4

Inverter Communications Adapter (ICA) 2–29Inverter Communications Adapter (ICA), wiring for 2–

29

Inverter Control Module (ICM) 2–29

Inverter Control Module (ICM), wiring for 2–29Inverter Stacking Control - Series (ISC-S) cable

additional accessory wiring 2–29grommets for ACCB-L slots 2–6

ISC-S/ICM cable slots 2–6

K

Knockout Preparation 2–8knockouts

location on the inverter 2–8preparation 2–8

L

Location 2–4

M

materials required for installation 2–2

O

Off-Grid Configurations 2–3On-Grid Configurations 2–3operation of bypass switch 3–2

P

preparation for installation 2–2proof of purchase WA–4purchase date WA–4

S

serial number WA–4specifications for the ACCB-L 1–4

Image 61
Contents Sine Wave Plus Long AC Conduit Box Owner’s Guide Page Sine Wave Plus Long AC Conduit Box Date and Revision Scope PurposeAudience OrganizationAbbreviations and Acronyms Conventions UsedRelated Information Important Safety Instructions Certifications Explosive gas precautionsContents Operation Figures Page Tables Xii Introduction 1The Sine Wave Plus ACCB-L Basic IntroductionACCB-L-L1 ACCB-L ACCB-L-L1 Specifications3ACCB-L Dimensions not to scale For more information see , Operation in this guide AC Bypass Switch Assembly5Blockoff Plates Blockoff PlatesPage Installation Installation Tools and Materials Preparing for the InstallationCode Compliance Off-Grid Configurations Configuration PlanningOn-Grid Configurations Service Planning Pre-InstallationLocation 12 305 mm Required Shock Hazard Warning Label Ventilation RequirementsRemoving and Replacing the Cover 3Cover Removal and Replacement4The Blockoff Plate on the Long AC Conduit Box Installing or Removing the Blockoff Plates5SW Plus Inverter, AC Side Showing Knockout Location Knockout Preparation6Knockouts Locations 7Installing Additional Breakers on the DIN Rail Installing Additional BreakersMounting on the Xantrex Back Plate XBP Mounting9Installing the ACCB-L on the Backplate To mount the Long AC Conduit Box on plywood Mounting on PlywoodWiring General 1Torque Values for Wiring Wire Sizes and Disconnect Requirements11ACCB-L Approved Internal Components 12ACCB-L-L1 Internal Components Factory installed Installation Single Inverter Configurations 120 Vac Wiring for Off-Grid ApplicationsInstallation Step-down Configurations 240 Vac to 120 Vac Installation Step-up Configuration Deep Well Pump 120 Vac to 240 Vac Dual Inverter Configurations 120 Vac and 240 Vac 20Wiring an On-grid Application Using a Single Inverter Wiring for On-Grid ApplicationsInstallation Step-up Configurations Utility Backup 120 Vac to 240 Vac Dual Inverter Configurations 120 Vac and 240 Vac 24Accessory Wiring for Single-Inverter Configurations Additional Accessory Wiring25Accessory Wiring for Dual-Inverter Configurations Operation Operating the AC Bypass Switch AC Bypass SwitchBypass Operation Normal OperationAC Input/Output Off Dual Inverters 240 Vac LoadsWarranty Warranty and Return InformationProduct DisclaimerExclusions Return Procedure Return Material Authorization PolicyOut of Warranty Service Serial Number Purchased From Purchase Date Information About Your SystemIndex IX-2 Rev a Page Xantrex Technology Inc