CE Certificate | Important notes |
Notes about boards
●During installation/deinstallation of the system board, observe the specific instructions described in the service manual for the server.
●Remove the plug from the mains outlet so that system and system board are totally disconnected from the mains voltage.
●To prevent damage to the system board, the components and conductors on it, please take great care when you insert or remove boards. Take great care to ensure that extension boards are slotted in straight, without damaging components or conductors on the system board, or any other components, for example EMI spring contacts
●Be careful with the locking mechanisms (catches, centring pins etc.) when you replace the system board or components on it, for example memory modules or processors.
●Never use sharp objects (screwdrivers) for leverage.
2.2CE Certificate
The shipped version of this board complies with the requirements of the EEC directive 89/336/EEC "Electromagnetic compatibility".
Compliance was tested in a typical PRIMERGY configuration.
6 | D2630 (RX600 S3) SAS |