Cisco Systems Cisco ASR 1006 quick start DC Power Supply Terminal Block

Page 20

Figure 14 DC Power Supply Terminal Block

1 2

 

 

 

OFF

 

 

 

 

 

 

 

 

55

 

-

 

 

 

 

48/-60V

 

40A

 

 

 

 

 

 

 

 

 

This

 

 

unit

 

 

might

e more

 

 

 

than

 

 

one

 

 

power supply

. All

 

 

4

3

must be

280027

1

DC power supply terminal block negative stud

3

Terminal block slotted keyed area

 

 

 

 

2

DC power supply terminal block positive stud

4

DC power supply terminal block plastic cover

 

 

 

 

Caution Before you continue to install the terminal block ground wires, stop and perform Step 5. To prevent any contact with metal lead on the ground wire and the plastic cover.

Step 3 You must wrap the positive and negative lead cables with sleeving. Take each lead wire and cover the area from the lug to the wire with heavy shrink sleeving (see Figure 15, item 3).

20

Image 20
Contents Cisco ASR 1006 Router Documentation and Resources Document Revision HistoryPrepare for Installation Prepare for Equipment Shelf or Tabletop InstallationSite Preparation and Unpacking Tools and PartsAttach the Rack-Mount Brackets-Chassis Front-Mounted Prepare for Rack-Mount InstallationRack-Mount the Router Attach the Rack-Mount Brackets-Chassis Rear Rack-Mounted Insert and tighten the black screws on one sideFour-Post Rack Installation Cisco ASR 1006 Router Rear Rack-MountingInstalling the Cisco ASR 1006 Router in a Four-Post Rack Two-Post Rack Installation Installing the Cisco ASR 1006 Router in a Two-Post Rack Attach the Cable-Management Bracket 280036 Chassis Ground Connection Installation Attaching a Grounding Lug to the Chassis Ground ConnectorManagement Ethernet Port Cable Connection Connect the Router to the NetworkConsole and Auxiliary Port Cable Connections Management Ethernet Port Connectors Connect the Shared Port Adapter CablesStart the System Install the Cables in the Cable-Management BracketConnecting AC-Input Power to the Cisco ASR 1006 Router Connect DC Power to the Cisco ASR 1006 Router Plug the power cable into the inletUnit. Statement Installing the Cisco ASR 1006 Router DC Ground Lugs Wiring the DC-Input Power Source DC Power Supply Terminal Block 280024 280311 Verifying Power Supply Operation DC Power Supply Terminal Block and Plastic CoverStart the System Following output displaysActv Validatepackage SHA-1 hash Page Etherport Page Configure Global Parameters Using the Setup Facility Configure the RouterUsing the Console Interface OK? No clns routing Tftptimeout Page Perform Other Configuration Tasks Check the Running Configuration SettingsSave the Running Configuration to Nvram After Installation Power Off the Cisco ASR 1006 RouterReplace a Power Supply in a Cisco ASR 1006 Router Remove and Then Replace an AC Power SupplyRemove the DC Power Supply Unit Might One All Install and Remove the Shared Port Adapter Replace the DC Power SupplyHandling a SPA Page USA