Page 22

Figure 16 DC Power Supply Terminal Block Positive and Negative Connections

280311

Step 5 Tighten the Kepnut screw to recommended torque of 18 in-lbs minimum to 22 in-lbs maximum for the positive stud and wire.

Note Secure the wires coming in from the terminal block so that they cannot be disturbed by casual contact.

Step 6 Use tie wraps to secure the wires, so that the wires are not pulled from the terminal block by casual contact. Ti-wrap studs are located below the power supply terminal block

Step 7 Replace the terminal block plastic cover and tighten the screw. The plastic cover is slotted and keyed to fit correctly over the terminal block. See Figure 17.

22

Image 22
Contents Cisco ASR 1006 Router Documentation and Resources Document Revision HistorySite Preparation and Unpacking Prepare for InstallationPrepare for Equipment Shelf or Tabletop Installation Tools and PartsRack-Mount the Router Prepare for Rack-Mount InstallationAttach the Rack-Mount Brackets-Chassis Front-Mounted Attach the Rack-Mount Brackets-Chassis Rear Rack-Mounted Insert and tighten the black screws on one sideFour-Post Rack Installation Cisco ASR 1006 Router Rear Rack-MountingInstalling the Cisco ASR 1006 Router in a Four-Post Rack Two-Post Rack Installation Installing the Cisco ASR 1006 Router in a Two-Post Rack Attach the Cable-Management Bracket 280036 Chassis Ground Connection Installation Attaching a Grounding Lug to the Chassis Ground ConnectorConsole and Auxiliary Port Cable Connections Connect the Router to the NetworkManagement Ethernet Port Cable Connection Management Ethernet Port Connectors Connect the Shared Port Adapter CablesConnecting AC-Input Power to the Cisco ASR 1006 Router Install the Cables in the Cable-Management BracketStart the System Connect DC Power to the Cisco ASR 1006 Router Plug the power cable into the inletUnit. Statement Installing the Cisco ASR 1006 Router DC Ground Lugs Wiring the DC-Input Power Source DC Power Supply Terminal Block 280024 280311 Verifying Power Supply Operation DC Power Supply Terminal Block and Plastic CoverStart the System Following output displaysActv Validatepackage SHA-1 hash Page Etherport Page Using the Console Interface Configure the RouterConfigure Global Parameters Using the Setup Facility OK? No clns routing Tftptimeout Page Save the Running Configuration to Nvram Check the Running Configuration SettingsPerform Other Configuration Tasks After Installation Power Off the Cisco ASR 1006 RouterReplace a Power Supply in a Cisco ASR 1006 Router Remove and Then Replace an AC Power SupplyRemove the DC Power Supply Unit Might One All Install and Remove the Shared Port Adapter Replace the DC Power SupplyHandling a SPA Page USA