2Prepare for Installation

This section contains information about tools and parts, warnings, site preparation information, and information for rack-mount installation and equipment shelf or tabletop installation.

Warning

Only trained and qualified personnel should install, replace, or service this equipment. Statement 1030

Before beginning this router installation, read the Regulatory Compliance and Safety Information for the Cisco ASR 1000 Series Aggregation Services Routers document.

Site Preparation and Unpacking

Lift the router safely out of the packing container.

Ensure the power service at the site is suitable for the router you are installing.

Check the packing slip to ensure that all the proper components are present.

Locate and have accessible the Site Log for recording information about this installation.

Tools and Parts

Use the following list of tools and parts as a checklist for preparing to install the Cisco ASR 1000 Series Aggregation Services Router:

ESD-preventative wrist strap

AC power cord

Appropriate cables to connect the router to the network and to the console terminal

Optional tape measure and level

Screwdrivers: Number 2 Phillips screwdriver and 3/16-inch flat-blade screwdriver

Grounding lug and wires

The rack-mount and cable-management kit:

Four 19-inch rack-mount brackets (front and rear rails) and two cable-management brackets

Three sets of screws: one set for front rack-mount brackets (black screws), another set for rear rack-mount brackets, and a set for the cable-management brackets (package with four screws)

Prepare for Equipment Shelf or Tabletop Installation

For a equipment shelf or tabletop installation, verify the following before installing the router:

The router is off the floor and has adequate ventilation.

An adequate chassis ground (earth) connection exists for the router.

The router needs at last 3 inches (7.62 cm) of clearance at the inlet and exhaust vents (sides of router).

The router needs 19 inches (48.26 cm) of clearance at the front and rear to allow for field-replaceable unit replacement or installation, or to access cables or equipment.

The shared port adapters are installed. If shared port adapters are not installed, then the slots must not be empty. Use filler panels for an empty slot.

3

Image 3
Contents Cisco ASR 1006 Router Document Revision History Documentation and ResourcesTools and Parts Prepare for InstallationPrepare for Equipment Shelf or Tabletop Installation Site Preparation and UnpackingPrepare for Rack-Mount Installation Rack-Mount the RouterAttach the Rack-Mount Brackets-Chassis Front-Mounted Insert and tighten the black screws on one side Attach the Rack-Mount Brackets-Chassis Rear Rack-MountedCisco ASR 1006 Router Rear Rack-Mounting Four-Post Rack InstallationInstalling the Cisco ASR 1006 Router in a Four-Post Rack Two-Post Rack Installation Installing the Cisco ASR 1006 Router in a Two-Post Rack Attach the Cable-Management Bracket 280036 Attaching a Grounding Lug to the Chassis Ground Connector Chassis Ground Connection InstallationConnect the Router to the Network Console and Auxiliary Port Cable ConnectionsManagement Ethernet Port Cable Connection Connect the Shared Port Adapter Cables Management Ethernet Port ConnectorsInstall the Cables in the Cable-Management Bracket Connecting AC-Input Power to the Cisco ASR 1006 RouterStart the System Plug the power cable into the inlet Connect DC Power to the Cisco ASR 1006 RouterUnit. Statement Installing the Cisco ASR 1006 Router DC Ground Lugs Wiring the DC-Input Power Source DC Power Supply Terminal Block 280024 280311 DC Power Supply Terminal Block and Plastic Cover Verifying Power Supply OperationFollowing output displays Start the SystemActv Validatepackage SHA-1 hash Page Etherport Page Configure the Router Using the Console InterfaceConfigure Global Parameters Using the Setup Facility OK? No clns routing Tftptimeout Page Check the Running Configuration Settings Save the Running Configuration to NvramPerform Other Configuration Tasks Power Off the Cisco ASR 1006 Router After InstallationRemove and Then Replace an AC Power Supply Replace a Power Supply in a Cisco ASR 1006 RouterRemove the DC Power Supply Unit Might One All Replace the DC Power Supply Install and Remove the Shared Port AdapterHandling a SPA Page USA