Cabletron Systems ESX-1320 manual Connecting to the Power Source, Installing the ESX in the Rack

Page 34

Chapter 3: Installation

3.With the mounting brackets installed, position the ESX between the vertical frame members of the 19-inch rack and fasten it securely with four user-supplied mounting screws as shown in Figure 3-12.

19-Inch Rack

MULTI PORT ETHERNET SWITCH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ESX-1320WITH FDSE™AND LANVIEW®

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PWR

 

 

 

 

 

 

 

 

 

 

 

 

RECEIVE

 

 

 

 

 

 

 

 

 

 

 

 

CPU

 

 

 

 

 

 

 

 

 

 

 

 

TRANSMIT

 

 

 

 

 

 

 

 

 

 

 

COM 2

COM 1

1

2

3

4

5

6

7

8

9

10

11

12

PORT

2X

3X

4X

5X

6X

7X

8X

9X

10X

11X

12X

 

 

 

 

 

 

 

 

 

 

 

 

1X

Screws (4)

1574-05

Figure 3-12 Installing the ESX in the Rack

Proceed to Section 3.7.3 for instructions to connect the ESX to a power source.

3.7.3Connecting to the Power Source

NOTE

The ESX has a universal power supply. This allows connection of the ESX to power sources ranging from 100 to 125 Vac, or 200 to 250 Vac, 50/60 Hz.

Connect power to the ESX as follows:

1.Plug the female end of the supplied power cord into the 3-prong receptacle on the back panel of the ESX.

2.Plug the power cord into a grounded wall outlet. The POWER LED turns ON (green) and the CPU LED turns ON (green) briefly.

NOTE

While booting, the ESX displays boot diagnostics and messages on Local Management, and the LCD also displays messages.

3-16

ESX-1320/ESX-1380 Installation Guide

Image 34
Contents Installation Guide Page ESX-1320/ESX-1380 Installation Guide DOC Notice Cabletron Software Program License Declaration of Conformity Contents Contents ESX-1320 and ESX-1380 Switches Chapter IntroductionUsing this Manual FeaturesFeatures Document Conventions Following conventions are used throughout this documentRelated Manuals Getting HelpAnonymous Reset Button Chapter Controls and IndicatorsLanview LEDs LCD Display Simplex or Full Duplex Mode OperationNetwork Management Capabilities Simplex or Full Duplex Mode Operation ESX-1320/ESX-1380 Installation Guide Chapter Installation Unpacking the ESX Removing the Chassis Cover Screws Setting Mode Switches Removing the Chassis CoverESX Mode Switch Location/Component Layout Setting Mode Switches Nvram Reset Switch Nvram Reset SwitchInstalling SIMMs Simm UpgradesLocating SIMMs Installing the Flash Simm Installing the Sdram or Ldram Simm Installing the ESX Brim ConnectionTabletop or Shelf Installation Tabletop or Shelf InstallationRackmount Installation Rack Mounting the ESX Connecting to the Power Source 12 Installing the ESX in the RackPRE-NETWORK Installation Test 13 Pre-Installation Test Connecting to the Network Connecting a Twisted Pair Segment to the ESX-132014 ESX-1320 Twisted Pair Connection Connecting a 10BASE-F Segment to the ESX-1380 15 Cable Pinouts RJ45 Crossover Cable16 ST Connector Insertion Chapter Troubleshooting Using LanviewTroubleshooting Using Lanview Troubleshooting Checklist Troubleshooting Checklist Using the Reset Button Reset ButtonUsing the LCD LCDUnsaved Initialization Messages Static System Messages From the last Static System messageStatic System Messages Displayed Messages Comments Alarm Messages From the product name displaySaved System Messages Displayed Messages CommentsFrom an Alarm Message display Failure or Error Messages Functionality Appendix a SpecificationsCOM Port 1 and COM Port Regulatory Electrical SpecificationsEnvironmental Requirements Physical PropertiesNetwork Requirements Appendix B Ethernet Cabling Requirements10BASE-T Twisted Pair Network Appendix B Ethernet Cabling Requirements Multimode Fiber Optic Network ESX-1320/ESX-1380 Installation Guide Index NumericsIndex-2 ESX-1320/ESX-1380 Installation Guide ESX-1320/ESX-1380 Installation Guide Index-3 Index Index-4 ESX-1320/ESX-1380 Installation Guide Power Supply Cord