CHAPTER 8 FPS1000 MAINTENANCE

8.1 Introduction

This chapter contains information about maintenance, calibration and troubleshooting of the FPS1000 power supply.

8.2 Units under warranty

Units requiring repairs during the warranty period should be returned to Densei-Lambda authorized service office. Unauthorized repairs performed by other than the authorized service facilities may void the warranty.

8.3 Periodic maintenance

No routine maintenance of the FPS1000 power supply is required except for periodic cleaning. To clean, disconnect the unit from the AC supply and allow 30sec. for discharging internal voltage. The FPS1000 should be cleaned using mild solution of detergent and water. The solution should be applied onto a soft cloth, and not directly to the surface of the unit. Do not use aromatic hydrocarbons or chlorinated solvents for cleaning. Use low pressure compressed air to blow dust from the unit.

8.4 Adjustments and Calibration

No internal adjustment or calibration are required. Units that are returned for repair will be calibrated at the service office.In any case ,opening the cover is not allowed.

8.5 Fan life expectancy

The fan life has limitation depending mainly on the ambient temperature. Please refer to Fig 8-1 for the expected fan life vs. the ambient temperature. In case that the fan should be replaced, contact your nearest Densei-Lambda authorized service office.

Life expectancy (years)

10

1

0

50

100

Ambient temperature (°C)

Fig 8-1: Expected fan life vs. ambient temperature

8.6 Before concluding that the unit is at fault:

Before concluding that the unit is at fault, make the following tests:

*Check if the AC voltage is within the specification range. *Check if the input and output wiring is correct.

*Check if the +S and -S wires are connected to the +Vout and -Vout (refer to sec. 4.11). *Check if the wires size is sufficient (refer to sec. 3.7.2).

*Check if the output voltage control, V_Trim, is connected properly (refer to sec. 4.2). *Check if the On/Off control is connected properly (refer to sec. 4.10).

*Check if the load current and power consumption are within the power supply specifications. *Audible noise can be heard during dynamic load operation.

*Audible noise can be heard when the input voltage waveform is not sinusoidal.

8.7 Parts replacement and repair

As repairs are made only by the manufacturer or by its authorized service offices, no parts replacement information is given inthis manual. In case of failure, unusual or erratic operation of the unit, contact your nearest Densei-Lambda sales and service office.

23

Image 26
Contents FPS Series 1000W In 1U FPS1000 Series Table of Contents Warranty Service WarrantyLimitation of Warranty DisclaimerFPS1000 Power Supply and FPS-S1U Rack Safety Instructions Safety Symbols FPS1000 Series Specifications Outline Drawings FPS 1000 Series Outline Drawings FPS 1000/P Series Outline Drawings FPS1000 Power Supply Installation Current Carrying Capacity Connecting the LoadLoad Wiring Making the load connections Noise and Impedance EffectsInductive loads Input/Output connector information Repackaging for ShipmentFunctions and Features Remote On/Off control Dcok signalACFail signal FPS10004.7KΩRemote Sensing Connecting Multiple loads, radial distribution method Connecting single load, Local sensingConnecting Single Load, Remote Sensing Basic Connections for OperationMultiple loads connection with distribution terminals Grounding outputsParallel operation with Remote sensing Parallel and Series OperationParallel operation Output voltage trimming at parallel operationSignal Return bus at parallel operation Remote On/Off control at parallel operationSeries operation Series connection for positive and negative output voltageI2C BUS Interface Option Eeprom functions Block diagram of the I2C optionOperation and functions 7.4.1. Digital status Output current readback Analog functions4 A/D Scaling Typical application diagram FPS1000FPS1000 Maintenance FPS-S1U 19 Rack Single Output Chapter FPS-S1U Rack Specifications Maximum output powerFPS-S1U Rack Installation FPS-S1U Rack MountingControl and monitoring signals connector Rear panel descriptionSCL I2C Modules location Blank panelsFPS-S1U and FPS-S1U/P Outline Drawings FPS-S1U/P Outline Drawing Basic Connections for Operation FPS-S1U Rack Multiple loads connectionOutput voltage trimming Supervisory signals12.4 On/Off control Parallel operation with Remote sensing Signal Return bus at parallel operation Output voltage trimming at parallel operationRemote On/Off control at parallel operation Addressing A0, A1, A2 FPS-S1U I2C BUS Interface OptionIntroduction Periodic maintenance FPS-S1U MaintenanceUnits under warranty Adjustments and CalibrationFPS-T1U 19 Rack Triple Output FPS-T1U Rack Specifications ChapterFPS-T1U Rack Installation FPS-T1U Rack MountingFPS-T1U Rear panel J1A, J2B, J3C Conector Description Modules location FPS-T1U and FPS-T1U/P Outline Drawings FPS-T1U/P Outline Drawing Basic Connections for Operation FPS-T1U Rack 19.2 On/Off controlOutput Voltag Trimming Load Series operation FPS-T1U I2C BUS Interface Option Module a Module B Module CFPS-T1U Maintenance