Patton electronic 2294, 2292 manual Planning the installation

Page 22

Model 2292 & 2294 Series Getting Started Guide

3 • Hardware installation

 

 

Planning the installation

Before you start the actual installation, it is strongly recommended that you gather all the information needed to install and setup the device. See table 3 for an example of what pre-installment checks you might need to carry out. Having carried out the pre-installation checks enables you to install and set up your SmartNode extender into an existing infrastructure with confidence.

The mains outlet that is utilized to power the equipment must be within 1 foot (0.3048 meters) of the device and shall be easily accessible.

Note When setting up your SmartNode extender consider cable length limita- tions, and potential electromagnetic interference (EMI) as defined by the applicable local and international regulations. Ensure that your site is prop- erly prepared before beginning installation.

Before installing the SmartNode extender device, the following tasks should be completed:

Create a network diagram (see section “Network information” on page 24)

Gather IP related information (see section “IP related information” on page 24 for more information)

Install the hardware and software needed to configure the SmartNode. (See section “Software tools” on page 24)

Verify power source reliability (see section “Power source” on page 24).

When you finish preparing for SmartNode extender installation, go to section “Installing the SmartNode extender” on page 25 to install the device.

Planning the installation

22

Image 22
Contents Model 2292 Mailsupport@patton.com Summary Table of Contents Table of Contents Compliance information List of Figures List of Tables Audience About this guideStructure Precautions Safety when working with electricity Preventing electrostatic discharge damage General observationsTypographical conventions used in this document General conventionsPage Chapter contents General informationSmartNode Series Leased-Line Extenders overview SmartNode extender SmartNode 2294 shownSmartNode 2292 and 2294 Leased-Line Extenders Examples of SmartNode 2292 and 2294 Series rear panelsReset button behavior Ports descriptionsSmartNode 2292 and 2294 front panels Applications overview Typical application Leased-line extensionHardware installation Planning the installation Create a network diagram see section Network information onInstallation checklist Task Verified by DateNetwork information Power sourceSite log IP related informationLocation and mounting requirements Installing the SmartNode extenderConnecting cables Mounting the SmartNode extenderInstalling an interface cable on the extender’s voice ports RJ-11, malePin Signal Installing the Ethernet cable TX+Connecting to a host Connecting to external power source Power VoIP Link Enet Getting started with the SmartNode Introduction Connect the SmartNode to the networkConfigure the IP address Power connection and default configurationConnect with the serial interface Login LEDs status and monitoring Status LEDs LEDContacting Patton for assistance Contact information Warranty coverageOut-of-warranty service Returns for creditRMA numbers Return for credit policyShipping instructions Appendix a Compliance information Compliance SafetyCE Declaration of Conformity Appendix B Specifications Voice Signaling Data ServicesQuality of Service CapacityManagement TemperatureVoice Processing SystemAppendix C Cabling Connecting a serial terminal Serial consoleEthernet 10Base-T and 100Base-T Ethernet cross-overAnalog FXS Ethernet straight-throughAppendix D Port pin-outs Ethernet 10Base-T and 100Base-T port Console portVoice port Appendix E Installation checklist Installation checklist