Patton electronic 2292, 2294 manual Installation checklist

Page 53

Model 2292 & 2294 Series Getting Started Guide

E • Installation checklist

 

 

Introduction

This appendix lists the tasks for installing a SmartNode 2292 or 2294 Series extender (see table 11) . Make a copy of this checklist and mark the entries as you complete each task. For each SmartNode 2292 or 2294 Series extender, include a copy of the completed checklist in your site log.

Table 11. Installation checklist

Task

Verified by

Date

 

 

 

Network information available & recorded in site log

 

 

 

 

 

Environmental specifications verified

 

 

 

 

 

Site power voltages verified

 

 

 

 

 

Installation site pre-power check completed

 

 

 

 

 

Required tools available

 

 

 

 

 

Additional equipment available

 

 

 

 

 

All printed documents available

 

 

 

 

 

SmartWare release & build number verified

 

 

 

 

 

Rack, desktop, or wall mounting of chassis completed

 

 

 

 

 

Initial electrical connections established

 

 

 

 

 

ASCII terminal attached to console port

 

 

 

 

 

Cable length limits verified

 

 

 

 

 

Initial configuration performed

 

 

 

 

 

Initial operation verified

 

 

 

 

 

Introduction

53

Image 53
Contents Model 2292 Mailsupport@patton.com Summary Table of Contents Table of Contents Compliance information List of Figures List of Tables Structure About this guideAudience Precautions Safety when working with electricity General observations Preventing electrostatic discharge damageGeneral conventions Typographical conventions used in this documentPage General information Chapter contentsSmartNode extender SmartNode 2294 shown SmartNode Series Leased-Line Extenders overviewExamples of SmartNode 2292 and 2294 Series rear panels SmartNode 2292 and 2294 Leased-Line ExtendersPorts descriptions Reset button behaviorSmartNode 2292 and 2294 front panels Applications overview Leased-line extension Typical applicationHardware installation Create a network diagram see section Network information on Planning the installationTask Verified by Date Installation checklistSite log Power sourceNetwork information IP related informationConnecting cables Installing the SmartNode extenderLocation and mounting requirements Mounting the SmartNode extenderRJ-11, male Installing an interface cable on the extender’s voice portsPin Signal TX+ Installing the Ethernet cableConnecting to a host Connecting to external power source Power VoIP Link Enet Getting started with the SmartNode Connect the SmartNode to the network IntroductionConnect with the serial interface Power connection and default configurationConfigure the IP address Login LEDs status and monitoring LED Status LEDsContacting Patton for assistance Out-of-warranty service Warranty coverageContact information Returns for creditShipping instructions Return for credit policyRMA numbers Appendix a Compliance information CE Declaration of Conformity SafetyCompliance Appendix B Specifications Quality of Service Data ServicesVoice Signaling CapacityVoice Processing TemperatureManagement SystemAppendix C Cabling Serial console Connecting a serial terminalEthernet cross-over Ethernet 10Base-T and 100Base-TEthernet straight-through Analog FXSAppendix D Port pin-outs Voice port Console portEthernet 10Base-T and 100Base-T port Appendix E Installation checklist Installation checklist