Model 2160 Series User Manual | 3 • Hardware installation |
|
|
Introduction
This chapter contains information for planning the installation of the Model 2160 with the following installa- tion procedures:
•“Unpacking the Model 2160” on page 30 lists the contents of the shipping box
•“Connecting cables” on page 30 describes how to install the port cables
•“Grounding the Model 2160 and connecting power” on page 31 describes how to ground and connect the power source
Planning the installation
Before beginning the actual installation, we strongly recommend that you gather all the information you will need to install and set up the device.
•Create a network diagram
•Gather IP related information
•Install the hardware and software needed to configure the Model 2160
•Verify power source reliability
When you finish preparing for your installation, go to section “Installing the Model 2160” on page 30 to install the device.
Introduction | 28 |