Patton electronic manual SmartNode 5400 front panel, SN5400

Page 18

SmartNode 5400 Getting Started Guide

1 • General information

 

 

SmartNode 5400 front panel

Figure 2 shows SmartNode 5400 front panel LEDs, the LED definitions are listed in table 4.

Enterprise

S

 

 

m

 

 

ar

d

 

Session

 

tNo

00

 

Border

 

 

54

 

 

Router

SN5400

SmartNode 5400

Enterprise Session Border Router

Power

Activity

VoIP

 

 

 

Ethernet 0/1

 

 

 

Activity

Ethernet 0/0 Ethernet 0/0

Ethernet 0/1

Ethernet 0/1

Link

1000

 

Link

1000

Ethernet 0/0

Ethernet 0/0

Ethernet 0/1

100

Activity

 

 

100

Figure 2. SmartNode 5400 front panel

SmartNode 5400 front panel

18

Image 18
Contents SmartNode 5400 Series Mailsupport@patton.com Summary Table of Contents Table of Contents Shdsl Basic Configuration Cabling List of Figures List of Tables About this guide AudienceStructure Precautions Impaired functioningSafety when working with electricity General observations Typographical conventions used in this document General conventionsConvention Meaning Chapter contents General informationSmartNode 5400 overview SN5400 model codesSmartNode 5400 rear panel SmartNode 5400 rear panel ports are described in tableWAN ETH 0/0 SmartNode 5400 front panel SN5400LED DescriptionApplications overview Introduction Typical applicationSmartNode installation Site log Planning the installationNetwork Diagram Network informationInstalling the gateway router Connecting the 10/100/1000Base-T Ethernet LAN and WAN cables Internal AC Power Supply Initial configuration Connecting the SmartNode to your laptop PC Connecting the SmartNode to your laptop PCLogin Configuring the desired IP addressFactory-default IP settings Changing the WAN IP addressConnecting the SmartNode to the network LANLoading the configuration optional Start-up with factory configuration BootloaderStart Bootloader Step Command PurposeStep Command Purpose Load a new application image SmartWare via the serial link Xmodem ymodem -bAdditional information Shdsl Basic Configuration Line Setup Configuring PPPoEConfiguration Summary Using PVC channels with PPPoE Setting up permanent virtual circuits PVCUsing PVC channels in bridged Ethernet mode Command PurposeTroubleshooting DSL Connections DiagnosticsContacting Patton for assistance Warranty coverage Contact informationPatton support headquarters in the USA Out-of-warranty service RMA numbersAppendix a Compliance information CE Declaration of Conformity Low-Voltage Directive SafetyCompliance Authorized European RepresentativeAppendix B Specifications Data connectivity Voice processing signalling dependentVoice signalling Fax and modem supportSystem IP servicesManagement PhysicalShdsl Daughter Card if applicable Factor SpecsIdentification of the SmartNode devices via Snmp SmartNode Model SysObjectIDAppendix C Cabling Connecting a serial terminal ConsoleEthernet Appendix D Port pin-outs Pin Signal Console portShdsl port Appendix E SmartNode 5400 factory configuration Introduction Appendix F End user license agreement End User License Agreement Termination Other licenses