| Q1 management | Automatic controll | Note |
|
|
|
|
Equipment tests |
|
|
|
|
|
|
|
Power up test |
| After power is switched on |
|
|
|
|
|
Self test | Self test (5.4) |
| During self test |
|
|
| management and line |
|
|
| connection is |
|
|
| disconnected. |
|
|
|
|
Line interface test |
|
| |
|
|
|
|
Network test | Loop to Line(5,3,2) |
| See Figure “Network |
loop |
|
| test loop” after this |
Data coming |
|
| table. |
|
|
| |
from the line is |
|
|
|
looped back to |
|
|
|
the line. |
|
|
|
|
|
|
|
Port interface test |
|
| |
|
|
|
|
Local test loop | Loop to Port(5,2,3) |
| See Figure “Local test |
Data coming |
|
| loop” after this table. |
|
|
| |
from the DTE is |
|
|
|
looped back to |
|
|
|
the DTE. |
|
|
|
|
|
|
|
DTE
Port Interface
Line
Interface
AIS
Figure 19. Local test loop
DTE
AIS |
Port Interface
Line Interface
Figure 20. Network test loop
36 (60) | © Nokia Corporation | DN0445814 |
| Nokia Proprietary and Confidential | Issue |