Viewing/Modifying Schedules
Use the following procedure to view or modify schedules in ThinkEssentials®.
To view or modify all schedules:
1. Switch to the SETTINGS tab. | |
| |
2. Click the VIEW ALL SCHEDULES | | ||
link. | |||
| |||
Modify the desired fields per |
| ||
instructions in the section |
| ||
“Creating/Modifying Schedules”, |
| ||
pages |
|
| |
NOTE: You can also check the |
|
| |
SHOW ALL SCHEDULES check box |
|
| |
while modifying schedules for any |
|
| |
scene or zone to view all schedule |
|
| |
items. |
| On Settings tab, select VIEW ALL SCHEDULES. |
Deleting Schedules |
| |
|
| |
Use the following procedure to |
| |
delete a schedule in |
| |
ThinkEssentials®. |
| |
To delete the schedule for a scene |
| |
or zone: | | |
1. | ||
| ||
button or |
| |
the scene or zone. | ||
2. Select the MODIFY SCHEDULE | ||
| ||
option. |
| |
3. To remove an existing schedule | | |
item, locate the item in the list. If | ||
you cannot locate the item, check | ||
| ||
the “Show All Schedules” check box |
| |
in the |
| |
Select Action drop down box to “No |
| |
Action (remove item.)” |
| |
4. When done, close the Schedules |
| |
Click NO ACTION (remove item) | ||
| ||
| to delete the scheduled action. | |
|
|
Schedules
21