Section 2: Start Up
To start up the RAC2-8:
1.Mount unit to wall.
2.Connect cables.
3.Set switches and jumpers on circuit boards as required for your application. Refer to instructions and illustrations in SECTION 5
— INSTALLATION.
4.Make user programmable selections from the local control panel or from an optional remote terminal. Refer to SECTION 4 — GLOSSARY OF CONTROL FUNCTIONS and SECTION 3 —
OPERATION.
5.Apply power to the unit. Note that the ON/OFF switch is inside the enclosure.
Figure 2–1. Local Control Panel
Liebert