GE GEK-106465A instruction manual Important Procedures, CIO Front View

Page 4

OVERVIEW

1. OVERVIEW

1.1.IMPORTANT PROCEDURES

To help ensure years of trouble free operation, please read through the following chapter for information to help guide you through the initial installation procedures of your new relay.

!

BEFORE ATTEMPTING TO INSTALL OR USE THE RELAY, IT IS IMPERATIVE THAT ALL WARNINGS AND CAUTIONS IN THIS MANUAL ARE REVIEWED TO HELP PREVENT PERSONAL INJURY, EQUIPMENT CAUTION: THE OPERATOR OF THIS INSTRUMENT IS ADVISED THAT IF THE EQUIPMENT IS USED IN A MANNER NOT SPECIFIED IN THIS MANUAL, THE PROTECTION PROVIDED BY THE EQUIPMENT MAY BE IMPAIRED

FIGURE 1-1 CIO FRONT VIEW

Installation must be according to the national electric code of the appropriate country

GEK-106465A

CIO Remote CAN Digital I/O Module

3

Image 4
Contents CIO Table of Contents INPUT/OUTPUT Modules Description Circuit Continuity Supervision InputsImportant Procedures CIO Front ViewInspection Checklist Identification Label A4454P5EUROPE, Middle East and Africa GE Multilin AMERICA, Asia and Australia GE MultilinSafety Instructions Overview Introduction to F650 and F600 Family of RelaysHardware Architecture Software ArchitectureCommunications Architecture Summary of Features Product DescriptionOrdering Code CIO DescriptionTechnical Specifications Packaging and Weight Type TestsCategory Standard Class Test ApprovalsPower supply Input/Output module Module DescriptionMechanical Description MountingRear Panel Mounting Rear Cover Description Wiring External ConnectionsWiring Diagram for Model CIOH1J1 226B5113F2 Boards Board OptionMixed Termina Inputs Supervision OutputsOperand Description SUPCOIL2Without Supervision With Current Supervision with SEAL-IN With Simple Voltage Supervision Internal State Circuit Output Breaker Operand StatusHardware Hardware With Double Voltage Supervision Status of Involved Elements Inputs to F650 52/a 52/bOperand Contact INPUT0015 SUPCOIL2 Front Indicators SoftwareUser Interfaces Circuit Supervision Circuit Supervision and Contact SEAL-IN CircuitsContact SEAL-IN Control Settings for INPUTS/OUTPUTS INPUT/OUTPUT Boards SettingsGeneral Board Settings Settings relative to Inputs Input LogicSettings relative to Outputs Output LogicInput activation signals Contact Inputs INPUTS/OUTPUTS StatusInput Status Mixed Board Supervision Board Board F, G, H, J TypeContact Outputs activation signals Contact Output Activation Signals Contact Output OperatesContact Output Status Board F, G, H, JContact Output Reset Signals Contact Output Resets Contact Output ResetsIO Board Status Board StatusGeneral Considerations on the Power Supply Network Visual InspectionIndicators Power Suply TestingIsolation Tests Source OptionSettings/Control Elements/Inputs Outputs/Board Communication with the Master UnitInputs and Outputs Digital InputsContact Outputs Circuit Continuity Supervision InputsCoil Latching Circuits