Enterasys Networks manual Setting Up the Matrix X16-C Chassis, Setup Order

Page 37

Setting Up the Matrix X16-C Chassis

Setting Up the Matrix X16-C Chassis

The following sections describe the procedures that must be followed to complete chassis installation. Chassis are shipped with all slots labeled “1” open. Coverplates over IOM slot 1, Fabric and Control Module slot 1, Fan Tray slot 1, and PS1 (power supply) are removed, and the slots are ready for module installation.

Setup Order

Once a suitable site has been chosen, proceed to install the Matrix X16‐C chassis in a rack. It is recommended that the Matrix X16‐C chassis installation proceed in this order:

1.Mount the chassis to a 19‐inch wide (48.26‐centimeter) rack or other secure location. Refer to “Installing the Matrix X16‐C Chassis” on page 3‐5.

2.Perform chassis bonding and grounding. Refer to “Chassis Bonding and Grounding” on page 3‐11.

3.Attach the Electrostatic Discharge wrist strap. Refer to “Attaching the Electrostatic Discharge Wrist Strap” on page 3‐13.

4.Install power supply module(s). Refer to “Installing and Removing a Power Supply” on page 3‐13.

5.Install fan tray(s). Refer to “Installing a Fan Tray” on page 3‐18.

6.Install IOMs, Fabric Modules, and Control Modules. Refer to “Installing and Removing Modules” on page 3‐20.

7.Install XFP/SFP optical transceivers and connect cables. Refer to “Attaching Cables, Installing Compact Flash Card and DIMM Upgrade Kit” on page 3‐26.

8.Install optional Cable Management Kit, if purchased, and gather and wrap cables in the velcro cable straps. Refer to “Optional Cable Management Kit” on page 3‐37.

9.Locate and learn the function of IOM, CM, and FM LEDs and the Reset button. Refer to “LEDs and Reset Button” on page 3‐42.

10.Minimally configure the X16‐C chassis to get it up and running and ready for more extensive software configuration. Refer to “First‐Time Quick Configuration” on page 3‐47.

Installing the Matrix X16-C Chassis

The Matrix X16‐C chassis is designed to be mounted in a standard 19‐inch wide (48.26‐centimeter) equipment rack or cabinet. Also, you can install two chassis in a standard 7‐foot high (213.36‐cm) rack. Use the following guidelines to mount the chassis:

Allow at least 60 centimeters (24 inches) of clearance in front of the rack for chassis installation

Install the following optional rack supports:

Rack support brackets are optional but recommended for four‐post cabinet installations

Mid‐mount brackets (optional support for shorter racks)

Attach the Matrix X16‐C chassis ears to the rack

Install grounding cables, as necessary

Matrix X16-C Chassis Installation Guide 3-5

Image 37
Contents Enterasys Matrix Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Declaration of Conformity Enterasys Networks, Inc Firmware License Agreement Viii Page Page Contents Index Appendix a Specifications and Regulatory ComplianceFigures Tables Who Should Use This Guide Using This GuideFor information about Refer to Conventions Used in This Guide Using the Matrix X Router Manual SetGetting Help Commonly Used AcronymsGetting Help Xviii About This Guide System Description OverviewMatrix X16-C Chassis as Shipped Front View Matrix X16-C Chassis as Shipped Rear View X16-C Input/Output Modules FeaturesX16-C Control Module Installing Redundant CMs into an Active Matrix X Router CM1 Monitor Values X16-C Fabric ModulePower Supply LEDs X16-C Redundant Power SuppliesAuto-Ranging Power Supplies Power Supply ReplacementRack-Mountable Chassis Features Overview Site Guidelines Site and Configuration GuidelinesConfiguration Guidelines Required Tools Matrix X16-C Chassis SetupShipping straps Shipping box Shipping skid Unpacking the Matrix X16-C ChassisShipping bag Shipping skid Chassis Accessory packageDisassembly Steps 6 through Setup Order Setting Up the Matrix X16-C ChassisInstalling the Matrix X16-C Chassis Installing Optional Rack Support Brackets Rack Rack support brackets Bracket screws Installing Optional Mid-Mount BracketsFastening Mid-Mount Brackets To rack‐mount the Matrix X16‐C chassis, proceed as follows Rack Mounting the Matrix X16-C ChassisRack Mounting the Matrix X16-C Chassis Rack Mounting the Mid-Mounted Chassis Chassis Bonding and GroundingTelcordia GR-1089 Grounding Hole Pattern and Cable Attaching the Electrostatic Discharge Wrist Strap Installing and Removing a Power SupplyGrounding Receptacle Plug Wrist strap Installing a Power Supply Power Supply PlanningPower supply slot PS1 Power supply coverplate Vent plate 13 Removing Power Supply Vent Plate15 Removing Blank Coverplate from Power Supply Slot 14 Installing Power Supply ModuleInlet power cord AC inlet AC1 Removing a Power SupplyInstalling a Fan Tray Installing and Removing a Fan Tray17 Removing Bottom Bezel Installing and Removing IOMs Installing and Removing ModulesRemoving a Fan Tray Captive screws IOM guide rails Ejector handles IOM slot21 Removing IOM Coverplate 20 Engaging Ejector HandlesControl Module slot Guide rails Captive screws Installing and Removing CMsReplacing the CM Battery 23 Installing Fabric Module Installing and Removing FMsInstalling an XFP/SFP Module XFP transceiver Port slot Release handle SFP transceiver Removing an XFP/SFP Module25 Attaching LC or MT-RJ Cable Connector Connecting Fiber-Optic CablesParameter Setting Connecting to the CM COM Port26 Connecting an IBM PC or Compatible Connecting the CM COM Port to a VT Series Terminal27 Connecting a VT Series Terminal Connecting the CM COM Port to a ModemCOM Port Adapter Wiring and Signal Diagram Adapter Wiring and Signal AssignmentsVT Series Port Adapter Wiring and Signal Diagram RJ45 DB25 Connecting to the CM USB PortModem Port Adapter Wiring and Signal Diagram RJ45 DB25 Compact Flash card Connector Control Module Installing a Compact Flash CardUSB device Control Module USB port Removing the DIMMs Installing the Memory Upgrade KitConnector fingers Connector arms Installing the DIMMsOptional Cable Management Kit To install the Cable Management Kit, proceed as follows Installing the Optional Cable Management Kit33 Installing the Bottom Cable Management Assembly 34 Securing Cables Using Velcro Cable Straps 35 Connecting 20 Amp AC Power Cord to the Power Supply Powering Up the Matrix X16-C ChassisPower Supply LEDs LEDs and Reset ButtonDC/AC Power Supply PS1-PS6 LED Definitions Function LED Activity DC Power LED37 Fan Tray LED Fan Tray LEDsControl and Fabric Module LEDs Module LEDs and Reset ButtonFan Tray LED Definitions Function LED ActivityState LED Activity Control and Fabric Module LED DefinitionsCM LEDs Only State LED Activity IOM LED Definitions IOM LEDsStatus LED LED Activity Ethernet Port LED RX/TX LED ActivityConfiguring Dhcp First-Time Quick ConfigurationAssigning an IP Address to eth0 Naming the Matrix X16-C Enabling NTPTable A-1 Matrix X-16C Specifications Chassis, Power Supply, and Fan Tray SpecificationsSpecification AC Power Supply ModuleFan Tray Table A-2 AC Power Supply RequirementsEnvironmental Table A-4 Redundancy Configurations for AC Line 100-120 Vac Table A-3 Module Power SpecificationsTable A-5 Redundancy Configurations for AC Line 200-240 Vac Table A-6 Twist Lock Power Cord Options Gigabit Ethernet Transceiver Specifications XFPTable A-8 XFP Fiber-Optic Specifications Module Wavelength Tx Power Rx Sensitivity Link PowerTable A-9 Recommended Cable Types and Specifications Gigabit Ethernet Transceiver Specifications SFPType Max. Reach Min. Reach1 Connector MGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SX SFP Input/Output SpecificationsTable A-10 Mini-GBIC Input/Output Port Specifications Table A-11 MGBIC-LC01 / MGBIC-MT01 Optical SpecificationsMGBIC-LC09 Specifications 1000BASE-LX MGBIC-LC03 Specifications 1000BASE-SXMGBIC-02 Specifications 1000BASE-T MGBIC-08 Specifications 1000BASE-ELXTable A-17 MGBIC-08 Optical Specifications Table A-19 MGBIC-02 SpecificationsCOM Port Pinout Assignments Pin Signal Name Input/OutputRegulatory Compliance Table A-20 COM Port Pin AssignmentsPage Index Mtbf RX/TX LED Index-4