Enterasys Networks 6H352-25 manual Figures

Page 11

Figures

Figure

 

Page

1-1

The 6H352-25 Module

1-2

3-1

Installing the 6H352-25 into the MATRIX E7 Chassis

3-4

3-2

Installing the 6H352-25 into the SmartSwitch 6000 Chassis

3-6

3-3

Connecting a Twisted Pair Segment to the 6H352-25

3-8

3-4

Crossover Cable RJ45 Pinouts

3-9

3-5

Straight-Through Cable RJ45 Pinouts

3-9

4-1

LANVIEW LEDs

4-2

4-2

RESET Button

4-7

B-1

Mode Switch Location

B-2

B-2

FLASH Memory Location

B-4

B-3

Installing the FLASH Memory

B-5

B-4

HSIM and VHSIM Connector Locations

B-6

Figures ix

Image 11
Contents 6H352-25 Fast Ethernet Installation Guide Page Page Vcci Notice FCC NoticeIndustry Canada Notice Enterasys NETWORKS, INC Program License Agreement Page Declaration of Conformity Page Contents Network Requirements Figures Tables About This Guide Using this GuideRelated Documents Structure of this GuideGuide uses the following conventions Document ConventionsGetting Help Introduction 6H352-25 Module Runtime IP Address Discovery ConnectivityOptional HSIMs and VHSIMs Remote Monitoring Rmon HALF-DUPLEX/FULL-DUPLEX AUTO-NEGOTIATIONSmartTrunk Traffic Rate Limiting Broadcast SuppressionPORT/VLAN Redirect Functions 12 802.1 Port Priority Garp Switch OperationFlow Control Management Switching OptionsDistributed Chassis Management Standards Compatibility Lanview Diagnostic LEDs10BASE-T Network SmartTrunk FeatureNetwork Requirements 100BASE-TX Network Installation Unpacking the 6H352-25 Installing Optional HSIM, VHSIM, or Flash Memory UpgradeInstalling the Module Into the Matrix E7 Chassis Installing the 6H352-25 into the Matrix E7 Chassis Installing the Module Into the SmartSwitch Chassis Installing the 6H352-25 into the SmartSwitch 6000 Chassis Connecting to the Network RX LED TX LED Crossover Cable RJ45 Pinouts Completing the Installation Using Lanview TroubleshootingGroup Select No link Is enabled and there is a OFF Troubleshooting ChecklistRefer to Matrix E7 Series Reset Button Using the Reset Button8Troubleshooting Ports SpecificationsEnvironmental COM Port Pinout AssignmentsRegulatory Compliance Page Required Tools Mode Switch Bank Settings and OptionsFigure B-1 Mode Switch Location Setting the Mode SwitchesSetting the Mode Switches Locating the Flash Memory Flash Memory UpgradeInstalling the Flash Memory Figure B-4 Hsim and Vhsim Connector Locations Installing Optional Hsim or Vhsim Interface ModulesNumerics IndexIndex-2