Enterasys Networks 6H352-25 manual Mode Switch Bank Settings and Options, Required Tools

Page 49

B

Mode Switch Bank Settings and Options

This appendix covers the following items:

Required tools (Section B.1)

Locations, functions, and settings for the mode switches (Section B.2)

Upgrading FLASH memory (Section B.3)

B.1 REQUIRED TOOLS

Use the following tools to perform the procedures provided in this appendix:

Antistatic wrist strap

Phillips screwdriver

CAUTION: An antistatic wrist strap is required (provided with the module) to perform the procedures in this appendix. Use the antistatic wrist strap when performing any of the procedures in this appendix to minimize ESD damage to the devices involved.

Mode Switch Bank Settings and Options

B-1

Image 49
Contents 6H352-25 Fast Ethernet Installation Guide Page Page Industry Canada Notice FCC NoticeVcci Notice Enterasys NETWORKS, INC Program License Agreement Page Declaration of Conformity Page Contents Network Requirements Figures Tables About This Guide Using this GuideRelated Documents Structure of this GuideGuide uses the following conventions Document ConventionsGetting Help Introduction 6H352-25 Module Optional HSIMs and VHSIMs ConnectivityRuntime IP Address Discovery SmartTrunk HALF-DUPLEX/FULL-DUPLEX AUTO-NEGOTIATIONRemote Monitoring Rmon PORT/VLAN Redirect Functions Broadcast SuppressionTraffic Rate Limiting Flow Control Garp Switch Operation12 802.1 Port Priority Distributed Chassis Management Switching OptionsManagement Standards Compatibility Lanview Diagnostic LEDsNetwork Requirements SmartTrunk Feature10BASE-T Network 100BASE-TX Network Installation Unpacking the 6H352-25 Installing Optional HSIM, VHSIM, or Flash Memory UpgradeInstalling the Module Into the Matrix E7 Chassis Installing the 6H352-25 into the Matrix E7 Chassis Installing the Module Into the SmartSwitch Chassis Installing the 6H352-25 into the SmartSwitch 6000 Chassis Connecting to the Network RX LED TX LED Crossover Cable RJ45 Pinouts Completing the Installation Using Lanview TroubleshootingGroup Select No link Is enabled and there is a OFF Troubleshooting ChecklistRefer to Matrix E7 Series Reset Button Using the Reset Button8Troubleshooting Ports SpecificationsEnvironmental COM Port Pinout AssignmentsRegulatory Compliance Page Required Tools Mode Switch Bank Settings and OptionsFigure B-1 Mode Switch Location Setting the Mode SwitchesSetting the Mode Switches Locating the Flash Memory Flash Memory UpgradeInstalling the Flash Memory Figure B-4 Hsim and Vhsim Connector Locations Installing Optional Hsim or Vhsim Interface ModulesNumerics IndexIndex-2