Enterasys Networks C2K122-24 manual Electromagnetic Compatibility EMC

Page 5

ELECTROMAGNETIC COMPATIBILITY (EMC)

This product complies with the following: 47 CFR Parts 2 and 15, CSA C108.8, 89/336/EEC, EN 55022, EN 61000‐3‐2, EN 61000‐3‐3, EN 55024, AS/NZS CISPR 22, VCCI V‐3.

COMPATIBILIDAD ELECTROMÁGNETICA (EMC)

Este producto de Enterasys cumple con lo siguiente: 47 CFR Partes 2 y 15, CSA C108.8, 89/336/EEC, EN 55022, EN 55024, EN 61000‐3‐2, EN 61000‐3‐3, AS/NZS CISPR 22, VCCI V‐3.

ELEKTRO- MAGNETISCHE KOMPATIBILITÄT ( EMC )

Dieses Produkt entspricht den folgenden Richtlinien: 47 CFR Parts 2 and 15, CSA C108.8, 89/336/EEC, EN 55022, EN 61000‐3‐2, EN 61000‐3‐3, EN 55024, AS/NZS CISPR 22, VCCI V‐3.

HAZARDOUS SUBSTANCES

This product complies with the requirements of European Directive, 2002/95/EC, Restriction of Hazardous Substances (RoHS) in Electrical and Electronic Equipment.

EUROPEAN WASTE ELECTRICAL AND ELECTRONIC EQUIPMENT (WEEE) NOTICE

In accordance with Directive 2002/96/EC of the European Parliament on waste electrical and electronic equipment (WEEE):

1.The symbol above indicates that separate collection of electrical and electronic equipment is required and that this product was placed on the European market after August 13, 2005, the date of enforcement for Directive 2002/96/EC.

2.When this product has reached the end of its serviceable life, it cannot be disposed of as unsorted municipal waste. It must be collected and treated separately.

3.It has been determined by the European Parliament that there are potential negative effects on the environment and human health as a result of the presence of hazardous substances in electrical and electronic equipment.

4.It is the users’ responsibility to utilize the available collection system to ensure WEEE is properly treated.

For information about the available collection system, please go to http://www.enterasys.com/services/support/ or contact Enterasys Customer Support at 353 61 705586 (Ireland).

iii

Image 5
Contents Enterasys SecureStack C2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC Firmware License Agreement Viii Page Page Contents Troubleshooting Figures Xiv Who Should Use This Guide How to Use This GuideAbout This Guide For Refer to Related DocumentsFollowing conventions are used in this guide Conventions Used in This GuideConventions Used in This Guide Xviii About This Guide Overview IntroductionC2K122-24 C2K122-24 Stackable Switch FrontConnectivity Redundant Power Supply CapabilityHigh-Speed Stack Connections Description of XFPsSwitch Configuration Using WebView Lanview Diagnostic LEDsSwitch Configuration Using CLI Commands ManagementSupport@enterasys.com Getting HelpGetting Help Introduction 10BASE-TX Network Network Requirements10GBASE-XX Network 100BASE-TX Network1000BASE-T Network Type Max. Length Connector Recommended Cable Types and Specifications10GBASE-XX Network Network Requirements Hardware Installation Unpacking the Switch Considerations Prior to InstallationContents of Switch Carton Quantity Required ToolsPreparation Installing Optional XFPsRemoving the XFP Installing the XFPInstalling the Rubber Feet Installing the Switch on a Flat SurfaceChassis Bottom, Rubber Feet Placement Guidelines for InstallationArea Guidelines for Switch Installation on Flat Surface Rack Mounting the SwitchAttaching Brackets and Installing in Rack Guidelines for Rackmount InstallationFastening the Switch to the Rack Connecting High-Speed Stacking CablesHigh-Speed Stacking Cable Connections Configuring Switches in a StackAbout SecureStack C2 Switch Operation in a Stack Installing a New Stackable System of Up to Eight Switches Recommended Procedures for New and Existing StacksAC Power Connecting AC and RPS PowerSwitch Rear View Stack Initialization Overview RPS PowerWhat Is Needed Connecting to Console Port for Local ManagementParameter Setting Connecting to an IBM or Compatible Device10 Connecting a VT Series Terminal Connecting to a VT Series Terminal11 Connecting to a Modem Connecting to a ModemConnecting UTP Cables Connecting to the Network13 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX TX1+ RX1- TX2+ TX3+ RX3- RX2- TX4+ RX4 Connecting Fiber-Optic Cables to LC Ports Connecting to the Network 17 Cable Connection to LC Fiber-Optic Connectors Initial Logon to Switch Management Completing the InstallationTroubleshooting C2K122-24 Lanview LEDs Using LanviewColor State Recommended Action Lanview LEDsRPS Refer to the SecureStack C2 Configuration Guide for proper Troubleshooting ChecklistRefer to the SecureStack C2 Configuration Guide for the IP Password Reset Switch Using the Password Reset SwitchUsing the Password Reset Switch Troubleshooting Specifications Table A-1 Switch Specifications C2K122-24 Switch SpecificationsPhysical EnvironmentalTable A-2 Supported XFP Transceivers SpecificationSupported XFP Transceiver Interface Options Table A-5 Compliance Standards Regulatory Compliance Console Port Pinout AssignmentsRegulatory Compliance Numerics IndexInstallation of 3-3specifications for A-3