Rack Mounting the Switch

Guidelines for Rackmount Installation

The installation site must be within reach of the network cabling and meet the requirements listed below:

Appropriate grounded power receptacles must be located within 152 cm (5 ft) of the location.

A temperature of between 5°C (41°F) and 40°C (104°F) must be maintained at the installation site with fluctuations of less than 10°C (18°F) per hour.

Note: To ensure proper ventilation and prevent overheating, leave a minimum clearance space of 5.1 cm (2.0 in.) at the left, right, and rear of the switch.

Warning: Before rack-mounting the device, ensure that the rack can support it without compromising stability. Otherwise, personal injury and/or equipment damage may result.

Advertencia: Antes de montar el equipo en el rack, asegurarse que el rack puede soportar su peso sin comprometer su propia estabilidad, de otra forma, daño personal o del equipo puede ocurrir.

Warnhinweis: Überzeugen Sie sich vor dem Einbau des Gerätes in das Rack von dessen Stabilität, ansonsten könnten Personenschäden oder Schäden am Gerät die Folge sein.

Attaching Brackets and Installing in Rack

Proceed as follows to install the switch into a 19‐inch rack:

1.Attach the rackmount brackets to the switch, as shown in Figure 3‐4, using the eight M3 x 6 mm flathead screws shipped with the switch.

Figure 3-4 Attaching the Rackmount Brackets

 

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

 

1

 

 

 

 

 

 

 

 

 

 

11

13

 

 

 

 

 

 

 

 

 

 

 

 

MGR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Console

RPS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CPU

DOWN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

14

 

 

 

 

 

 

 

 

 

 

 

23

24

25

25

TX RX

26C2K122-24

26

TX RX

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Á À

À

Á

1 Rackmount brackets

2 M3 x 6 mm flathead screws

 

 

2.With the mounting brackets attached, position the switch between the vertical frame members of the 19‐inch rack as shown in Figure 3‐5. Then fasten the switch securely to the frame using four mounting screws (user supplied).

3-8 Hardware Installation

Image 38
Contents Enterasys SecureStack C2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC Firmware License Agreement Viii Page Page Contents Troubleshooting Figures Xiv Who Should Use This Guide How to Use This GuideAbout This Guide Related Documents For Refer toConventions Used in This Guide Following conventions are used in this guideConventions Used in This Guide Xviii About This Guide Introduction OverviewC2K122-24 Stackable Switch Front C2K122-24High-Speed Stack Connections Redundant Power Supply CapabilityConnectivity Description of XFPsSwitch Configuration Using CLI Commands Lanview Diagnostic LEDsSwitch Configuration Using WebView ManagementGetting Help Support@enterasys.comGetting Help Introduction Network Requirements 10BASE-TX Network10GBASE-XX Network 100BASE-TX Network1000BASE-T Network Recommended Cable Types and Specifications Type Max. Length Connector10GBASE-XX Network Network Requirements Hardware Installation Contents of Switch Carton Quantity Considerations Prior to InstallationUnpacking the Switch Required ToolsInstalling Optional XFPs PreparationInstalling the XFP Removing the XFPInstalling the Switch on a Flat Surface Installing the Rubber FeetGuidelines for Installation Chassis Bottom, Rubber Feet PlacementRack Mounting the Switch Area Guidelines for Switch Installation on Flat SurfaceGuidelines for Rackmount Installation Attaching Brackets and Installing in RackConnecting High-Speed Stacking Cables Fastening the Switch to the RackConfiguring Switches in a Stack High-Speed Stacking Cable ConnectionsAbout SecureStack C2 Switch Operation in a Stack Recommended Procedures for New and Existing Stacks Installing a New Stackable System of Up to Eight SwitchesConnecting AC and RPS Power AC PowerSwitch Rear View RPS Power Stack Initialization OverviewConnecting to Console Port for Local Management What Is NeededConnecting to an IBM or Compatible Device Parameter SettingConnecting to a VT Series Terminal 10 Connecting a VT Series TerminalConnecting to a Modem 11 Connecting to a ModemConnecting to the Network Connecting UTP Cables13 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX TX1+ RX1- TX2+ TX3+ RX3- RX2- TX4+ RX4 Connecting Fiber-Optic Cables to LC Ports Connecting to the Network 17 Cable Connection to LC Fiber-Optic Connectors Completing the Installation Initial Logon to Switch ManagementTroubleshooting Using Lanview C2K122-24 Lanview LEDsLanview LEDs Color State Recommended ActionRPS Troubleshooting Checklist Refer to the SecureStack C2 Configuration Guide for properRefer to the SecureStack C2 Configuration Guide for the IP Using the Password Reset Switch Password Reset SwitchUsing the Password Reset Switch Troubleshooting Specifications Physical Switch SpecificationsTable A-1 Switch Specifications C2K122-24 EnvironmentalTable A-2 Supported XFP Transceivers SpecificationSupported XFP Transceiver Interface Options Table A-5 Compliance Standards Regulatory Compliance Console Port Pinout AssignmentsRegulatory Compliance Index NumericsInstallation of 3-3specifications for A-3