Dialogic
SS7G21, SS7G22
manual
Product Installation and Hot-Swap Actions
Specs
Install
SS7 Signaling Boards
Activity/Fault LED green/amber
Controls and Indicators
Date Issue No Description
Accessories
Ethernet Interfaces Connectors
Replacing the Back-up Battery
DC Power Input Terminal Block
Page 58
Chapter 9 Product Installation and
Hot-Swap
Actions
58
Page 57
Page 59
Image 58
Page 57
Page 59
Contents
Dialogic SS7G21 and SS7G22 Signaling Servers
Publication Date January Document Number 05-2300-007, Issue
Contents
Figures
Index
Tables
Date Issue No Description
Revision History
Part 1 User’s Guide
Qualified Service Technician Operations
If AC Power Supplies are Installed Mains AC Power Disconnect
If DC Power Supplies are Installed Isolation
Page
Purpose
Introduction
Products
Server Board
Power Supplies
SS7 Signaling Boards
Hard Disk Drive
Cooling
Ethernet Ports
Related Information
Product Applicability
Applicability
Product ID Description
AC Power Supply Module
Product Specification
DC Power Supply Module
Signaling Links
SS7 Serial Interfaces
PCM Interface
Ethernet Interfaces
Controls and Indicators
Alarm Outputs
Serial Port COM2
ID switch
MNR Alarm LED amber PWR Alarm LED amber
Activity/Fault LED green/amber
Visual Indicators on the Ethernet Ports
Product Reliability
Physical Specifications
Environmental Specifications
Calculated Product Reliability
Product Specification
Specifications Demonstrating Compliance Safety Compliance
Regulatory Specifications and Declarations
Electromagnetic Compatibility EMC
Telecommunications Compliance
US ICKCNNANSS7HDP
Declaration of Conformity
Declarations of the Manufacturer or Importer
No D0006
Česky
FCC Part 15 ElectroMagnetic Compliance Statement USA
FCC Part 68 Statement USA
Telecommunications Notice Australia / New Zealand
Telecommunications Attachment Notice Canada
Telecommunications Notice Taiwan
Essential Compliance Information
Safety
2 EMC Installation of Cables
Further Information
Product Environmental Information
Regulatory Specifications and Declarations
Hardware Description
Overview
Feature Description More Information
Front Panel Control, Indicator and Switch Function Summary
Front Panel
Back Panel
Description Informatio
Rack Mounting Options
AC Power Input
DC Power Input Terminal Block
Safety Ground Studs for Earthing
Interfaces
SS7 Serial Interface Ports
PCM Interface Ports Connector Pinouts
Pin No Direction Function
SS7 Serial Interface Connector Aux on SPCI2S
SS7 Serial Interface Ports Dual V.11 Connector Pinouts
Ethernet Interfaces Connectors
Ethernet Interface Connector Pinouts
Serial Port COM2 Connector
Alarms
Pin No Description
Part 2 Service Technician’s Guide
Page
Qualified Service Technician Operations
If AC Power Supplies are Installed Mains AC Power Disconnect
If DC Power Supplies are Installed Isolation
Page
Tools and Supplies Needed
Tools and Supplies Needed
Tools and Supplies Needed
Product Installation and Hot-Swap Actions
Installation Overview
Power Supply Related Actions
Safety Ground Studs, Conductor Installation
Replacement of Power Supply Module in AC Products
DC Power Supply Module, Initial Connections
DC Power Supply Module Terminal Block
DC Power Supply Module, Transferring Connections
AC-input Power Supply Cage, Connection
Product Installation and Hot-Swap Actions
Unlocking and Removing an AC Power Supply Module
Hard Disk Drive HDD Replacement
Replacing the Hardware
Backing up the System Configuration
Files Backed Up to the syslog Subdirectory at Startup
File Type Description
Restoring the System Configuration
Replacing the Hard Disk Drive
Product Installation and Hot-Swap Actions
Safety Before Removing the Top Cover
Working Inside the Product
Removing and Installing the Top Cover
Top Cover Removal and Installation Internal Product Layout
Major Components in an SS7G21 and SS7G22 Chassis
10.5 SS7 Signaling Boards
Preparing Spci Signaling Boards for Installation in SS7G21
SS7G21 Variants
Quantity of Boards Variant Suffix Board Position
Board Boards Switch
D1W D2W Position D3W / Q3W Setting Positions Q1W Q2W
Jumpers
Installing or Replacing an SS7 Signaling Board
Boards Position Switch 00W H1W H2W H3W Setting
Installing and Replacing an SS7 Signaling Board
Replacing the Back-up Battery
CT Bus Cable Notes
Varning
Working Inside the Product
International Warnings
International Warnings
Avertissements Français
Avertissements Français suite
Warnung Deutsch
Warnung Deutsch Fortsetzung
Avvertenza Italiano
Avvertenza Italiano continua
Advertencia Español
Advertencia Español continuación
Product ID Description SS7G21 and SS7G22 Product IDs
Operating Mode IDs
Part Number Reference
Protocol Module IDs
Accessories
Expansion Options or Spare Assemblies
Linux Software Distribution
Software Licensing Information
GNU C Library
Software Licensing Information
Appendix a
Connecting to V.11 V.35-Compatible SS7 Links
Connectors on the SPCI2S Signaling Board
Cabling
Connecting an SPCI2S to a Nortel DMS100
Connecting an SPCI2S to an M34 Block Connector
Connecting an SPCI2S to an Inet Tester
SPCI2S/SIU Generates Clocking
Configuring the SIU SPCI2S to Operate on V.11 Ports
Clocking
SPCI2S/SIU Receiving Clock
Appendix a
Glossary
CT Bus
Glossary
Index
FCC
Mtbf
Switches
Related pages
All Install page
Installation for Philips 190V3
XLA 3200 Installation Manual for Bosch Appliances XLA 3200
Installation Steps for Kenmore 625.3844
Select Uninstall and click Uninstall for Samsung CLP775ND
Optional Receptacle Panel Installation Instructions for Toshiba 1600EP Series
Installing the Celeron or Pentium III Processor Cartridge for NEC VT 300i
Manager installation for Dell 7.4
++Installing the Samsung Audio Remote App for Samsung HW-K430/XN
Install Additional HP Accessories for HP Server tc2110
Installing Software for Lanier LP 036c
What does the battery charging icon in
Pocket PC HTC
mean?
Top
Page
Image
Contents