Dialogic SS7G22, SS7G21 manual International Warnings

Page 69

Dialogic® SS7G21 and SS7G22 Signaling Servers Hardware Manual Issue 7

Chapter 11: International Warnings

11.1WARNING: English

The power supply in this product contains no user-serviceable parts. There may be more than one supply in this product. Refer servicing only to qualified personnel.

Do not attempt to modify or use the supplied AC power cord if it is not the exact type required. A product might be equipped with more than one AC power cord.

The Power button on the system does not turn off all system power. To remove all power from the system, you must unplug/disconnect the power cord from the system.

To avoid injury from electrical and mechanical hazards, chassis covers should only be removed by qualified service personnel.

SAFETY STEPS: Whenever you remove the chassis covers to access the inside of the system, follow these steps:

1.Turn off all peripheral devices connected to the system.

2.Turn off the system by pressing the Power button.

3.Unplug/disconnect the power cord from the system.

4.Label and disconnect all telecommunication cables and all other cables connected to connectors or ports on the back of the system.

5.Provide some electrostatic discharge (ESD) protection by wearing an anti-static wrist strap attached to chassis ground of the system—any unpainted metal surface—when handling components.

6.Do not operate the system with the chassis covers removed.

After you have completed the five SAFETY steps above, you can remove the system covers. To do this:

1.Remove and save all screws from the covers.

2.Remove the covers.

For proper cooling and airflow, always reinstall the chassis covers before turning on the system. Operating the system without the covers in place can damage system parts. To install the covers:

1.Check first to make sure you have not left loose tools or parts inside the system.

2.Check that cables, add-in boards, and other components are properly installed.

3.Attach the covers to the chassis with the screws removed earlier, and tighten them firmly.

4.Connect all external cables and the power cord to the system.

continued

69

Image 69
Contents Dialogic SS7G21 and SS7G22 Signaling Servers Publication Date January Document Number 05-2300-007, Issue Contents Index FiguresDate Issue No Description TablesRevision History Part 1 User’s Guide Qualified Service Technician Operations If AC Power Supplies are Installed Mains AC Power Disconnect If DC Power Supplies are Installed Isolation Page Introduction PurposeProducts SS7 Signaling Boards Power SuppliesServer Board Hard Disk DriveEthernet Ports CoolingRelated Information Applicability Product ApplicabilityProduct ID Description DC Power Supply Module Product SpecificationAC Power Supply Module Signaling LinksPCM Interface SS7 Serial InterfacesEthernet Interfaces Alarm Outputs Controls and IndicatorsSerial Port COM2 Activity/Fault LED green/amber MNR Alarm LED amber PWR Alarm LED amberID switch Visual Indicators on the Ethernet PortsEnvironmental Specifications Physical SpecificationsProduct Reliability Calculated Product ReliabilityProduct Specification Regulatory Specifications and Declarations Specifications Demonstrating Compliance Safety ComplianceElectromagnetic Compatibility EMC US ICKCNNANSS7HDP Telecommunications ComplianceDeclarations of the Manufacturer or Importer Declaration of ConformityNo D0006 Česky FCC Part 68 Statement USA FCC Part 15 ElectroMagnetic Compliance Statement USATelecommunications Attachment Notice Canada Telecommunications Notice Australia / New ZealandTelecommunications Notice Taiwan 2 EMC Installation of Cables SafetyEssential Compliance Information Further InformationProduct Environmental Information Regulatory Specifications and Declarations Overview Hardware DescriptionFront Panel Control, Indicator and Switch Function Summary Feature Description More InformationFront Panel Description Informatio Back PanelRack Mounting Options Safety Ground Studs for Earthing DC Power Input Terminal BlockAC Power Input InterfacesPCM Interface Ports Connector Pinouts SS7 Serial Interface PortsPin No Direction Function SS7 Serial Interface Ports Dual V.11 Connector Pinouts SS7 Serial Interface Connector Aux on SPCI2SEthernet Interfaces Connectors Serial Port COM2 Connector Ethernet Interface Connector PinoutsPin No Description AlarmsPart 2 Service Technician’s Guide Page Qualified Service Technician Operations If AC Power Supplies are Installed Mains AC Power Disconnect If DC Power Supplies are Installed Isolation Page Tools and Supplies Needed Tools and Supplies NeededTools and Supplies Needed Installation Overview Product Installation and Hot-Swap ActionsPower Supply Related Actions Replacement of Power Supply Module in AC Products Safety Ground Studs, Conductor InstallationDC Power Supply Module, Initial Connections DC Power Supply Module Terminal Block AC-input Power Supply Cage, Connection DC Power Supply Module, Transferring ConnectionsProduct Installation and Hot-Swap Actions Hard Disk Drive HDD Replacement Unlocking and Removing an AC Power Supply ModuleFiles Backed Up to the syslog Subdirectory at Startup Backing up the System ConfigurationReplacing the Hardware File Type DescriptionReplacing the Hard Disk Drive Restoring the System ConfigurationProduct Installation and Hot-Swap Actions Working Inside the Product Safety Before Removing the Top CoverRemoving and Installing the Top Cover Top Cover Removal and Installation Internal Product Layout Preparing Spci Signaling Boards for Installation in SS7G21 10.5 SS7 Signaling BoardsMajor Components in an SS7G21 and SS7G22 Chassis SS7G21 VariantsD1W D2W Position D3W / Q3W Setting Positions Q1W Q2W Board Boards SwitchQuantity of Boards Variant Suffix Board Position JumpersBoards Position Switch 00W H1W H2W H3W Setting Installing or Replacing an SS7 Signaling BoardInstalling and Replacing an SS7 Signaling Board CT Bus Cable Notes Replacing the Back-up BatteryVarning Working Inside the Product International Warnings International Warnings Avertissements Français Avertissements Français suite Warnung Deutsch Warnung Deutsch Fortsetzung Avvertenza Italiano Avvertenza Italiano continua Advertencia Español Advertencia Español continuación Part Number Reference Operating Mode IDsProduct ID Description SS7G21 and SS7G22 Product IDs Protocol Module IDsExpansion Options or Spare Assemblies AccessoriesSoftware Licensing Information Linux Software DistributionGNU C Library Software Licensing Information Connectors on the SPCI2S Signaling Board Connecting to V.11 V.35-Compatible SS7 LinksAppendix a CablingConnecting an SPCI2S to an M34 Block Connector Connecting an SPCI2S to a Nortel DMS100Connecting an SPCI2S to an Inet Tester Clocking Configuring the SIU SPCI2S to Operate on V.11 PortsSPCI2S/SIU Generates Clocking SPCI2S/SIU Receiving ClockAppendix a CT Bus GlossaryGlossary FCC IndexMtbf Switches