Dialogic SS7G21, SS7G22 manual CT Bus Cable Notes, Replacing the Back-up Battery

Page 66

Chapter 10 Working Inside the Product

Figure 24. Cable Tie Securing SS7 Signaling Board to Card Keep Frame

Cable Tie

CT Bus Cable Notes

Note: When the CT Bus cable is installed, it is important that the two end connectors must be connected to boards. To achieve this consider the following:

For single board systems, the CT Bus cable cannot be connected. For systems delivered as “single board”, the cable is stowed in clips fastened to the underside of the Top Cover.

If adding a second board to a system, the CT Bus cable should be taken from the clips and connected to the two boards.

For “two board” systems, the two end connectors of the CT Bus cable must be used, and only the center connector may be left disconnected.

10.6Replacing the Back-up Battery

A lithium battery on the Server Board provides power to maintain date and time settings in the absence of main AC or DC power. When the battery starts to weaken, it loses voltage, and the date and time settings may be wrong. The battery may be replaced by one labeled with Manufacturer and Part Number information that is identical to that marked on the original battery, or contact your customer service representative for advice on approved equivalent devices.

WARNING

Danger of explosion if battery is incorrectly replaced. Replace only with the same or equivalent type recommended by the equipment manufacturer. Discard used batteries according to the manufacturer's instructions.

ADVARSEL!

Lithiumbatteri - Eksplosionsfare ved fejlagtig håndtering. Udskiftning må kun ske med batteri af samme fabrikat og type. Levér det brugte batteri tilbage til leverandøren.

66

Image 66
Contents Dialogic SS7G21 and SS7G22 Signaling Servers Publication Date January Document Number 05-2300-007, Issue Contents Figures IndexDate Issue No Description TablesRevision History Part 1 User’s Guide Qualified Service Technician Operations If AC Power Supplies are Installed Mains AC Power Disconnect If DC Power Supplies are Installed Isolation Page Introduction PurposeProducts Server Board Power SuppliesSS7 Signaling Boards Hard Disk DriveEthernet Ports CoolingRelated Information Applicability Product ApplicabilityProduct ID Description AC Power Supply Module Product SpecificationDC Power Supply Module Signaling LinksPCM Interface SS7 Serial InterfacesEthernet Interfaces Alarm Outputs Controls and IndicatorsSerial Port COM2 ID switch MNR Alarm LED amber PWR Alarm LED amberActivity/Fault LED green/amber Visual Indicators on the Ethernet PortsProduct Reliability Physical SpecificationsEnvironmental Specifications Calculated Product ReliabilityProduct Specification Regulatory Specifications and Declarations Specifications Demonstrating Compliance Safety ComplianceElectromagnetic Compatibility EMC Telecommunications Compliance US ICKCNNANSS7HDPDeclaration of Conformity Declarations of the Manufacturer or ImporterNo D0006 Česky FCC Part 15 ElectroMagnetic Compliance Statement USA FCC Part 68 Statement USATelecommunications Attachment Notice Canada Telecommunications Notice Australia / New ZealandTelecommunications Notice Taiwan Essential Compliance Information Safety2 EMC Installation of Cables Further InformationProduct Environmental Information Regulatory Specifications and Declarations Hardware Description OverviewFront Panel Control, Indicator and Switch Function Summary Feature Description More InformationFront Panel Back Panel Description InformatioRack Mounting Options AC Power Input DC Power Input Terminal BlockSafety Ground Studs for Earthing InterfacesPCM Interface Ports Connector Pinouts SS7 Serial Interface PortsPin No Direction Function SS7 Serial Interface Connector Aux on SPCI2S SS7 Serial Interface Ports Dual V.11 Connector PinoutsEthernet Interfaces Connectors Ethernet Interface Connector Pinouts Serial Port COM2 ConnectorAlarms Pin No DescriptionPart 2 Service Technician’s Guide Page Qualified Service Technician Operations If AC Power Supplies are Installed Mains AC Power Disconnect If DC Power Supplies are Installed Isolation Page Tools and Supplies Needed Tools and Supplies NeededTools and Supplies Needed Product Installation and Hot-Swap Actions Installation OverviewPower Supply Related Actions Replacement of Power Supply Module in AC Products Safety Ground Studs, Conductor InstallationDC Power Supply Module, Initial Connections DC Power Supply Module Terminal Block DC Power Supply Module, Transferring Connections AC-input Power Supply Cage, ConnectionProduct Installation and Hot-Swap Actions Unlocking and Removing an AC Power Supply Module Hard Disk Drive HDD ReplacementReplacing the Hardware Backing up the System ConfigurationFiles Backed Up to the syslog Subdirectory at Startup File Type DescriptionRestoring the System Configuration Replacing the Hard Disk DriveProduct Installation and Hot-Swap Actions Safety Before Removing the Top Cover Working Inside the ProductRemoving and Installing the Top Cover Top Cover Removal and Installation Internal Product Layout Major Components in an SS7G21 and SS7G22 Chassis 10.5 SS7 Signaling BoardsPreparing Spci Signaling Boards for Installation in SS7G21 SS7G21 VariantsQuantity of Boards Variant Suffix Board Position Board Boards SwitchD1W D2W Position D3W / Q3W Setting Positions Q1W Q2W JumpersInstalling or Replacing an SS7 Signaling Board Boards Position Switch 00W H1W H2W H3W SettingInstalling and Replacing an SS7 Signaling Board Replacing the Back-up Battery CT Bus Cable NotesVarning Working Inside the Product International Warnings International Warnings Avertissements Français Avertissements Français suite Warnung Deutsch Warnung Deutsch Fortsetzung Avvertenza Italiano Avvertenza Italiano continua Advertencia Español Advertencia Español continuación Product ID Description SS7G21 and SS7G22 Product IDs Operating Mode IDsPart Number Reference Protocol Module IDsAccessories Expansion Options or Spare AssembliesSoftware Licensing Information Linux Software DistributionGNU C Library Software Licensing Information Appendix a Connecting to V.11 V.35-Compatible SS7 LinksConnectors on the SPCI2S Signaling Board CablingConnecting an SPCI2S to an M34 Block Connector Connecting an SPCI2S to a Nortel DMS100Connecting an SPCI2S to an Inet Tester SPCI2S/SIU Generates Clocking Configuring the SIU SPCI2S to Operate on V.11 PortsClocking SPCI2S/SIU Receiving ClockAppendix a Glossary CT BusGlossary Index FCCMtbf Switches