Matsushita CF-Y5LWVYZ 1 2 service manual Insert the Main Board, DXQT2+E6FNL, DXQT2+D25FNL

Page 46

9.3.3.7. Insert the Main Board

(Attention)

-The board is set in the receiving treatment device and works.

-When carrying to the following process, a special palette is used. (The FPC bend in YB respect is prohibited)

Safety Work

Pressurizes with the battery the finger is put in the PCMCIA slot.

 

 

 

 

 

 

 

 

 

 

Safety Work

 

 

 

 

 

 

 

 

 

 

 

 

 

 

After the pin by which the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Coin Battery Affixes

to the sheet..Does not get on the board.

position is decided is inserted, a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

fixed screw is tightened.

 

 

 

1-3mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The cable is processed to this part remaining. Does

 

 

 

After the screw is tightened, the

 

 

 

 

 

 

 

 

 

not get on a top side in the main body of the battery.

 

 

 

pin is detached.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Edge side central distribution

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4mm-2

 

Screw

 

 

 

 

 

Tape

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Slit externals match

 

 

 

 

 

 

 

 

 

 

 

 

 

(DXQT2+E6FNL)

 

 

 

 

 

0-1.5mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Affixation

 

 

 

 

 

 

*Does not overlap in the slit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W-LAN Module Preparation goods

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

within this range

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Safety Work

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(DXQT2+D25FNL)

 

 

 

 

Fit to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The adsorption sheet of the

 

 

 

 

 

connector

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

axis for fixation is peeled off

 

 

 

 

 

 

 

 

 

affixation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Memory Spreader

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Screw

 

before installs. (2 places)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(DXQT2+D25FNL)

 

 

 

 

 

 

 

 

Safety Work

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MODEM Preparation goods

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The adsorption sheet of the

 

 

 

 

 

 

 

Screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

axis for fixation is peeled off

 

 

 

 

 

 

 

(DXQT2+D25FNL)

 

 

 

 

 

 

 

before installs. (2 places)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Valley case

Bend with 0.5 or more (Use the treatment device)

AL Sheet externals standard

MODEM CN installation

Board Label

 

LAN CN installation

0 2mm

Character

 

 

 

 

 

 

direction (Upper)

 

 

 

 

 

 

 

 

 

 

 

MODEM LAN Holder

Installs so that the cable should not cross.

9.3.3.8. Note of Wireless LAN module is inserted

<Notes when Wireless LAN Module is inserted>

Please do Board’s insertion and extraction correctly according to the direction and the procedure shown in the figure below

Please go from parallel respect to mounting Board in Board’s insertion and extraction within the range of 5 -10 Please insert in the interior completely when you insert Board.

46

Image 46
Contents CF-Y5 How to replace the fuse For U.K This apparatus must be earthed for your safetyLaser Safety Information Page Page Contents „ Main Specifications SpecificationsSecondary cache memory Wireless LAN BluetoothUseful Information Getting Started Names and Functions of Parts DC-IN Jack Ventilation Hole External Display Port SD Memory Card Slot Bluetooth AntennaBattery Latches Battery Pack Emergency Hole RAM Module Slot Headphone JackBlock Diagram Yonah LV Dual CoreDiagnosis Procedure Troubleshooting Flow ChartOutline of Post Power-On Self Test Boot CheckError Diagnosis by Checking Beep Signal Sound DiagnosisStuck key 02D0 System cache error Cache disabled Self Diagnosis Test When you execute an automatic testWhen you execute the enhancing test Shift and left Shift keysOperation of PC-Diagnostic Utility Content of the setup is returned to the setting of the user PC-Diagnostic utility End methodSelection of tested device Enhancing Place with possibiliBreakdown. e.g.. Head, Motor Cable characteristic and deviceStandard Enhanced Memory as Vram may fail withWiring Connection Diagram LCDDisassembly instructions Removing the HDD Before disassembly, be sure to perform the following stepsPreparation Removing the KeyboardRemoving the Top Case Preparation perform the .2.1., 9.2.3. firstFfcpadffcsw Removing the SUB DVDPreparation perform the .2.1., 9.2.3. and 9.2.4. first SUB DVDPad WP Sheet LCD Knob LCD Latch Spring Top Case Removing the Touch Pad / LCD KnobRemoving the Solenoid / Disc Cover Lock Top Case Screw Q Solenoid Line Hold Sheet Cable Fixed SheetPreparation perform the .2.1 9.2.4. first Removing the Speaker L, RRemoving the FAN FANRemoving the Main Board Removing the Drive UnitGadket Removing the Antenna Board Unit L, R Removing the DC-IN CableUSB FPC Preparation perform the .2.1 9.2.11. first Removing the ModemModem Removing the LCD Unit and the LCD Rear Removing the LCD UnitRemoving the Hinge Cover L, R Preparation perform the .2.1 9.2.18. firstRemoving the LCD Cable / Inverter Board CN2Putting LCD Side Cushion / LCD Tape Assembly knowhow of the LCDAssembly of the LCD Front 2mm Hinge Side 1mm Hook Side LCD Side CushionSide Rubber Putting LCD Side Rubber / LCD Side DamperLCD Rib Rib standardPutting LCD Cushion / Assembly of the Inverter Putting LCD MagnetOrder Putting Tape for LCD CablePreparation for Inverter Case Externals matchPage Page Assembly knowhow of the Main Board Putting Line Hold Sheet / Antenna Sheet / BT PWB CushionPutting MCH Sheet / Heat Spreader Bottom Assembly of the Main Board Assembly of the Wlan Sheet / MCH Thermal TapeHDD FPC Assembly of the Card Bus Ejector Right before building Left before building Square holeAssembly of the Wireless LAN Module / Modem Safety workDXQT2+E6FNL Insert the Main BoardDXQT2+D25FNL Assembly knowhow of the Top Case Assembly of the Disk CoverPutting Disk Angle Cushion Assembly of the Top CaseLan Sw Blank Installation LAN on /OFFCase rib and folds to the rib side Assembly of the LCD Knob / Putting CushionTop Case Rib SECAssembly of the Touch Pad Pad Cover ExternalsSafety work Install the Pad CoverPad Cover installation position Affixes Disk cover cushion Putting SheetFixation seat CushionAssembly of the Break Lever Axis nor the shuttlecock Assembly of the FANConclusion Engagement fingernail is Assembly of the Disk Cover ClickAssembly of the Disk Cover Lock / SW PCB Confirmation two places asAffixation Disk Lever Fix Cushion SW PCB yellow line Screw DXHM0056ZA Yellow lineSW PCB Possible to recycleAssembly of the Solenoid Assembly of the SpeakerWiring Speaker Cable Putting Cushion / Tape / Sheet Difference lineAssembly of the SW PCB FFC Page Assembly of the Dimm Cover Assembly knowhow of the Bottom CasePutting Line Hold Sheet LED Lenz SD Cutting lack part top side Putting Foot Rubber FIG1 Safety WorkDo not go out of the rib Keyboard preparation Assembly knowhow of the BodyInstallation of Main Board Main PWB AssyAssembly of the HDD Slot Guard FIG2Side without tape Putting Line Hold Sheet 3 / Line Hold CushionBack Insert the Modem Cable in the slitANT PWB FFCCable in CN Installation of LCD UnitSide with I-PEX stamp Cable black Tape ExternalsDFHE5035ZB CPUAssembly of the DVD Drive Affixes Gasket Cloth FIG1Assembly of the Body Installation of Power Knob / LAN SW KnobLAN ON/OFF Top Case side screw tightening Installation of K/B Heat SpreaderDXQT2+E6FNL DXQT2+F3FNL DXQT2+E10FNL DRQT2+E8FKL Installation of Disk Cover / Disk Side Cover Installation of KeyboardSide Cover R Installation of K/B Side CoverHow to detach Keyboard and K/B Side Cover Side Cover LInstallation of HDD Bottom Case side screw tighteningPutting Label DFQT0046ZAExploded View Screw tightening torqueCabinet Section K52 K145 K157N7 Screw tightening torque Replacement Parts List REF. no and AreaDFHG1874YA LCD Cushion DFMD1202ZA DC Jack Plate DFHR3D21YA Line Hold Sheet DXQT2+E6FNL Screw EEFSX0D331ER CF-Y5LWVYZBM 2006/11/16 REF. no and AreaEEFCX0D221R EEFCX0G151R ConnectorEEFCX0J101R EEFCD0D101ERDiode IC, Temperature Censor ICIC, USB Power SW DEDRB081L20 DiodeIC, Audio Power Amplifier IC, FET SwitchIC, Q-SWITCH IC, Power Management SwitchB1GBCFNL0017 Transistor B1GFCFEN0003 TransistorB1GBCFNN0042 Transistor ERJ2GEJ102X RESISTOR, 1/16W, 1KΩERJ2GEJ100X ERJ2GEJ103X RESISTOR, 1/16W, 10KΩERJ2GEJ201X ERJ2GE0R00X RESISTOR, 1/16W, 0ΩERJ2RKF2002X RESISTOR, 1/16W, 20KΩ ERJ2GEJ105X RESISTOR, 1/16W, 1MΩERJ2RKF3922X ERJ2GEJ472XCONNECTOR, USB Slide SwitchEVQPLDA15 Switch Bluetooth ModuleERJ2GE0R00X RESISTOR, 1/16W, 0Ω