Matsushita CF-Y5LWVYZ 1 2 service manual Putting MCH Sheet / Heat Spreader Bottom

Page 42

9.3.3.2. Putting MCH Sheet / Heat Spreader Bottom

Running aground do not be on DAI

The flaking off paper in which "5011" is displayed is peeled off and then affixes to MCH.

MCH externals

standard 0

1mm

Safety work

 

Processes along the

DIMM connector

 

 

 

Coil externals standard.

 

 

 

MCH externals

Thing in which affixation

does not exist in coil.

standard 0 1mm

Coil externals standard Line Hold Sheet

Safety work

Line Hold Sheet 1

Affixes in a Sheet externals standard, and fixes Antenna Cable.

 

 

 

 

 

 

 

 

Affixation as touch the Coil

 

Heat Spreader Bottom

Space 0-1mm

 

 

 

 

Antenna Cable

 

 

 

 

 

 

 

 

 

 

 

 

CPU Cushion

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Safety work

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Affixes to the capacitor

Affixes in

 

 

 

 

 

 

 

 

 

 

Antenna Cable fixes by Line Hold

the silk frame

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sheet 1 by processing on the Heat

 

 

 

 

 

 

 

 

 

 

 

 

Affixation as fit the

 

 

 

 

 

 

 

 

 

Spreader Bottom Sheet.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Touch the DIMM Connector

CPU Cushion

 

 

 

 

 

 

 

 

 

 

Space 0-0.5mm

 

 

 

 

 

 

 

 

 

 

Affixation space 0-1mm

CPU Thrmal Sheet

 

 

 

 

 

 

 

 

 

 

 

wn out here

 

 

 

 

 

 

 

 

Antenna Cable is dra

 

 

 

 

 

 

CPU Thrmal Sheet is

CPU Cushion externals

a thing to the

standard 0 1mm

capacitor without

 

 

 

 

 

 

 

 

 

 

 

 

 

running aground

 

 

 

 

 

 

 

 

 

 

 

 

 

Bottom side Heat Sheet preparation specification

Sheet side of Heat Spreader Bottom

Grease1 (G-751)

Spreads by using the treatment device.

Coil externals standard 0-1mm

CPU Thrmal Tape

1-2mm

It is confirmed that CPU Thrmal Sheet does not run aground to the capacitor

42

Image 42
Contents CF-Y5 How to replace the fuse For U.K This apparatus must be earthed for your safetyLaser Safety Information Page Page Contents Specifications „ Main SpecificationsSecondary cache memory Wireless LAN BluetoothUseful Information Getting Started Names and Functions of Parts DC-IN Jack Ventilation Hole External Display Port SD Memory Card Slot Bluetooth AntennaBattery Latches Battery Pack Emergency Hole RAM Module Slot Headphone JackBlock Diagram Yonah LV Dual CoreDiagnosis Procedure Troubleshooting Flow ChartOutline of Post Power-On Self Test Boot CheckError Diagnosis by Checking Beep Signal Sound DiagnosisStuck key 02D0 System cache error Cache disabled Self Diagnosis Test When you execute an automatic testWhen you execute the enhancing test Shift and left Shift keysOperation of PC-Diagnostic Utility PC-Diagnostic utility End method Content of the setup is returned to the setting of the userSelection of tested device Enhancing Place with possibiliBreakdown. e.g.. Head, Motor Cable characteristic and deviceStandard Enhanced Memory as Vram may fail withWiring Connection Diagram LCDDisassembly instructions Removing the HDD Before disassembly, be sure to perform the following stepsPreparation Removing the KeyboardRemoving the Top Case Preparation perform the .2.1., 9.2.3. firstFfcpadffcsw Removing the SUB DVDPreparation perform the .2.1., 9.2.3. and 9.2.4. first SUB DVDPad WP Sheet LCD Knob LCD Latch Spring Top Case Removing the Touch Pad / LCD KnobRemoving the Solenoid / Disc Cover Lock Top Case Screw Q Solenoid Line Hold Sheet Cable Fixed SheetPreparation perform the .2.1 9.2.4. first Removing the Speaker L, RRemoving the FAN FANRemoving the Drive Unit Removing the Main BoardGadket Removing the DC-IN Cable Removing the Antenna Board Unit L, RUSB FPC Removing the Modem Preparation perform the .2.1 9.2.11. firstModem Removing the LCD Unit and the LCD Rear Removing the LCD UnitRemoving the Hinge Cover L, R Preparation perform the .2.1 9.2.18. firstRemoving the LCD Cable / Inverter Board CN2Putting LCD Side Cushion / LCD Tape Assembly knowhow of the LCDAssembly of the LCD Front 2mm Hinge Side 1mm Hook Side LCD Side CushionSide Rubber Putting LCD Side Rubber / LCD Side DamperLCD Rib Rib standardPutting LCD Cushion / Assembly of the Inverter Putting LCD MagnetOrder Putting Tape for LCD CablePreparation for Inverter Case Externals matchPage Page Assembly knowhow of the Main Board Putting Line Hold Sheet / Antenna Sheet / BT PWB CushionPutting MCH Sheet / Heat Spreader Bottom Assembly of the Wlan Sheet / MCH Thermal Tape Assembly of the Main BoardHDD FPC Assembly of the Card Bus Ejector Right before building Left before building Square holeAssembly of the Wireless LAN Module / Modem Safety workInsert the Main Board DXQT2+E6FNLDXQT2+D25FNL Assembly knowhow of the Top Case Assembly of the Disk CoverPutting Disk Angle Cushion Assembly of the Top CaseLan Sw Blank Installation LAN on /OFFCase rib and folds to the rib side Assembly of the LCD Knob / Putting CushionTop Case Rib SECAssembly of the Touch Pad Pad Cover ExternalsSafety work Install the Pad CoverPad Cover installation position Affixes Disk cover cushion Putting SheetFixation seat CushionAssembly of the Break Lever Assembly of the FAN Axis nor the shuttlecockConclusion Engagement fingernail is Assembly of the Disk Cover ClickAssembly of the Disk Cover Lock / SW PCB Confirmation two places asAffixation Disk Lever Fix Cushion SW PCB yellow line Screw DXHM0056ZA Yellow lineSW PCB Possible to recycleAssembly of the Solenoid Assembly of the SpeakerWiring Speaker Cable Putting Cushion / Tape / Sheet Difference lineAssembly of the SW PCB FFC Page Assembly knowhow of the Bottom Case Assembly of the Dimm CoverPutting Line Hold Sheet LED Lenz SD Cutting lack part top side FIG1 Safety Work Putting Foot RubberDo not go out of the rib Keyboard preparation Assembly knowhow of the BodyInstallation of Main Board Main PWB AssyAssembly of the HDD Slot Guard FIG2Side without tape Putting Line Hold Sheet 3 / Line Hold CushionBack Insert the Modem Cable in the slitANT PWB FFCCable in CN Installation of LCD UnitSide with I-PEX stamp Cable black Tape ExternalsDFHE5035ZB CPUAssembly of the DVD Drive Affixes Gasket Cloth FIG1Installation of Power Knob / LAN SW Knob Assembly of the BodyLAN ON/OFF Installation of K/B Heat Spreader Top Case side screw tighteningDXQT2+E6FNL DXQT2+F3FNL DXQT2+E10FNL DRQT2+E8FKL Installation of Disk Cover / Disk Side Cover Installation of KeyboardSide Cover R Installation of K/B Side CoverHow to detach Keyboard and K/B Side Cover Side Cover LInstallation of HDD Bottom Case side screw tighteningPutting Label DFQT0046ZAExploded View Screw tightening torqueCabinet Section K52 K145 K157N7 Screw tightening torque Replacement Parts List REF. no and AreaDFHG1874YA LCD Cushion DFMD1202ZA DC Jack Plate DFHR3D21YA Line Hold Sheet DXQT2+E6FNL Screw CF-Y5LWVYZBM 2006/11/16 REF. no and Area EEFSX0D331EREEFCX0D221R EEFCX0G151R ConnectorEEFCX0J101R EEFCD0D101ERDiode IC, Temperature Censor ICIC, USB Power SW DEDRB081L20 DiodeIC, Audio Power Amplifier IC, FET SwitchIC, Q-SWITCH IC, Power Management SwitchB1GBCFNL0017 Transistor B1GFCFEN0003 TransistorB1GBCFNN0042 Transistor ERJ2GEJ102X RESISTOR, 1/16W, 1KΩERJ2GEJ100X ERJ2GEJ103X RESISTOR, 1/16W, 10KΩERJ2GEJ201X ERJ2GE0R00X RESISTOR, 1/16W, 0ΩERJ2RKF2002X RESISTOR, 1/16W, 20KΩ ERJ2GEJ105X RESISTOR, 1/16W, 1MΩERJ2RKF3922X ERJ2GEJ472XCONNECTOR, USB Slide SwitchEVQPLDA15 Switch Bluetooth ModuleERJ2GE0R00X RESISTOR, 1/16W, 0Ω