3.RPM Schedule
This screen is for scheduling the RPM’s outlets to perform a specific Action (Fig. 46). To add a new schedule, select the “New” button. To make changes to the current schedule, select [Edit]. To remove a schedule, select [Delete].
Fig. 46-RPM Schedule Screen
After selecting the “New” button or [Edit], the following screen will appear (Fig. 47). Select the desired shutdown and restart configuration and then click the Save button.
•RPM: The user can select which RPM to perform the Action
•Outlet: The user can select which outlet to perform the Action.
•Outlet Action: The user can select to turn on the RPM’s outlet or turn off the RPM’s outlet.
•Date: The user can configure the RPM to perform the Action ‘Once’ on the specified date (format: mm/dd/yyyy) or the RPM can be configured to perform the Action ‘Every’ week on the specified day.
•Time: The user can select the time of day to perform the Action (format:
Fig. 47-New Schedule Event Screen
31