PS Audio 1500 MKII Manual Simulation of Power Outage for the UPS, To conduct a simulation-test

Page 10

®

Installation & Operating Instructions

 

 

Owner’s Reference PowerPack 1500 MKII

 

 

 

 

 

 

 

Function

Panel Indicator

 

 

 

 

Switch Off

Press and hold the main off switch for more than 3 seconds until the vi-

 

 

sual indicators turn off.

 

 

 

 

Cold Start/

This UPS can be turned on even when AC is not present.

 

Start on

 

 

Battery

 

2.5Manual Simulation of Power Outage for the UPS

To test the backup function, you may unplug the power cord of the UPS or sim- ply press the main on switch (silence/test) button on the front panel. The UPS backup mode LED will turn on.

If the UPS is left to run continuously, it is a good idea to perform a periodic functionality test on the unit. To perform this test simply press the test button on the front of the UPS or unplug the power cord to the UPS to simulate the utility blackout.

Observe that your equipment operates properly and uninterrupted during this period. Plug the power cord back in if the function test was performed by unplugging it.

To conduct a simulation-test:

Switch the UPS on and wait for the Power On indicator to light up. Then unplug the UPS from the AC outlet to simulate a utility failure.

When utility failure occurs, power is immediately supplied to your equipment from the UPS battery.

If the utility power is not restored, the UPS will soon run out of battery power and will shut itself down.

4826 Sterling Drive, Boulder, CO 80301

 

PH: 720.406.8946 service@psaudio.com www.psaudio.com

Getting Started 10

©2009 PS Audio International Inc. All rights reserved.

Image 10
Contents Owner’s Reference IntroductionTable Of Contents Important Safety Instructions IntroductionSystem Descriptions Features Box should include the following Unpacking & Inspection OverviewGetting Started 5V Rear Panel Ventilation InstallationCharge the Battery Connect to ACConnect to PowerPlay Connect the LoadOn Battery Mode AC ModeOperation and Functionality Test Manual Simulation of Power Outage for the UPS To conduct a simulation-testInstallation & Operating Instructions Setting Parameters Output ‘Frequency Setting Output ‘Frequency Setting Installation & Operating Instructions AVR Boost Range Setting Energy Saving mode Visual Indicators Audible / Visual Indicators Operating StatusLED1 LED2 LED3 LED4 LED5 LED6 Abnormal Status Indicators Screws Interface with PowerPlay Interface with PowerPlayWarranty WarrantyConditions Remedy Miscellaneous Outside the US If you require Service in NorthService AmericaYour serial ServiceIf you have problems Voltage changes Number Your purchase informationTroubleshooting TroubleshootingTroubleshooting Troubleshooting Specifications subject to change without prior notice Specifications Specifications