Leica user manual Quick way to start with the TPS400 Mining Programs

Page 2

The quick way to start with the TPS400 Mining Programs.

To use equipment in the permitted manner, please refer to the detailed safety instructions in the TPS400 User Manual (English version).

© 2003 Leica Geosystems AG Heerbrugg, ® All rights reserved.

TPS400 Mining Manual-1.0.0en

2

The quick way to start

 

Image 2
Contents TPS400 Series Quick way to start with the TPS400 Mining Programs Contents Overview Contents Introduction How to use this manualSymbols used in the sequence of operation Known Unknown Peg SurveyIntroduction Data uploading using Mining Editor Before starting Peg SurveyStart and execution Peg Survey StepValid coords Error messagesStation or BS point has no Number of sets Measure Backsight Point Proceeding Peg SurveySequence Set 1 of totalMeasure or DIST/REC ExitRepeat and until all sets are measured DHD ResultsDHz MHz MHDBS/FS AverageResidual Results Saving dataResult Coordinates foresight pointFront Line Peg Grades KnownStart and execution Grades Slope gradient explained Gradeline Marking Height difference dHgt and horizontal distance dHD explained Grades Result Measurement dataPoint Offset Start and execution Offset Start and execution Offset Saving data Offset informationPolar setout Setting outSetting out coordinates from memory Procedure Orthogonal setout Cartesian setout Result is displayed Tie DistanceRadial Method Determine second target Polygonal MethodSoftkeys polygonal method Softkeys radial methodMining Editor Installation on the PCProgram content Mining EditorExample1 Practical ExamplesDefine and upload Tolerances Example2Creating fixpoint files Define tolerances File ! Save AsFile ! Open Second Example Importing of fixpoints in Ascii format Process import fixpoint filesISO standard