Start and execution Peg Survey
•Press [MENU] and [F1] for programs.
•Press [F1] for Peg Survey.
>Step 1 Select a job.
>Step 2 Confirm the set of tolerances.
> Step 3
Choose "Start" by pressing [F4], then enter point number (PtID) and instrument height (hi) for the station.
The sign for the instrument height (hi) is normally negative.
> Step 4 [SET]
Set Point number (PtID) and instrument height (hi).
[EXIT] Leaves "Input Station" and returns to the
TPS400 Mining | 8 | Peg Survey |