Nortel Networks P0605618, 555-7101-217 manual Connecting the server to power, Before you begin

Page 68

Installing the server and connecting the peripheral devices

Standard 1.0

Connecting the server to power

Before you begin

Ensure that proper power and grounding are available for all the power outlets serving the CallPilot server and its associated peripherals. Power for these devices must be wired and fused independently of all other receptacles and referenced to the same ground as the PBX system.

Aqualified electrician must implement the single-point ground reference as required between the power outlets of the CallPilot server and the power outlets of the switch.

Provide a sufficient number of properly grounded power outlets or power bars for all equipment.

For more information, refer to Chapter 2, “Grounding and power requirements”, in the CallPilot Planning and Engineering Guide.

68

CallPilot

Image 68
Contents CallPilot P0605618 CallPilot Page Publication history Publication history Contents Index Installing the server and connecting the peripheralDevices 1001rp server description A p t e rServer features Server dimensions and weightIntroduction 49.5 cm 19.5Front panel features front view without the front bezel Alarm boardRear panel diagram Overhead view of empty server showing PCI and ISA connectors 1001rp slot assignments Slot assignmentsSlot definition and slot numbering Single Board Computer Slot Reserved for COM1 COM2 I/O bracket SlotElan Network card Slot Clan Network card Slot 12bBRD20 IRQ mapping table IRQ Network connectivity Sample network setup Meridian Customer LAN optionalSample network setup Succession CSE Telephony LAN/Customer LAN 10/100BaseT or 100BaseTSwitch connectivity CallPilot Elan and Clan network setupRemote access connectivity Network requirementsSupported peripheral devices Modem Kbps external modem NTRH9078 providesSince the modem is an external device, it requires its own Also supported, but has been replaced by the 56 KbpsPreparing for installation Installation overview Installation checklistMay 2003Preparing for installation Conventions for warnings To unpack the equipment Follow this procedure to unpack the server and peripheralsUnpacking the 1001rp server What’s next? Removing the front bezel and server cover About the front bezel doorsTo remove the front bezel Continue with Inspecting the server interior on To remove the server coverHigh current inside the chassis can cause severe injury To replace the front bezel after installation is complete Inspecting the server interior To inspect the server interiorPreparing for installationStandard Power supply installation Equipment handling guidelines Safety precautionsSafety information Section a Installing the power supply modules AC or DC AC versus DC systems Installing the second power supply module AC or DCAbout the power supply module Power supply modules To install the power supply module Do one of the followingSection B Setting up DC power source for a 1001rp DC server DC wire gauge tables Metric wire conversion Following diagram shows typical rack power cabling DC rack cabling48VDC power distribution rationale About the Power Distribution Unit Multiple PDUsPDU terminal blocks and wiring diagram DC power inputBringing power and ground into the PDU To bring DC power and ground into the PDUMay Power supply installation Installing the server and connecting the peripheral devices Installing the server To install the serverPreparing the modem Required equipmentModem DIP switches DIPTo set the modem DIP switches OFF The modem sends a CD signal when it OFF Loads Y or Y1 configuration fromAT command set recognition OFF Disables command recognition dumbConnecting peripherals to the server Rear panel connectionsTo connect the mouse, keyboard, and monitor to the server To connect the modem to the serverContinue with Connecting the server to the Elan on To connect the server to the Elan Connecting the server to the ElanMedia Access Control address Feature key adapter dongle. See Connecting the server to the Clan optional To connect the server to the ClanWhat’s next? Installing the Nortel Networks software feature key adapter To install the software feature key adapter For installation, you require a Phillips No screwdriverContinue with Connecting the server to power on RequirementsConnecting the server to power Before you beginCallPilot server To connect the 1001rp AC server to power To connect the 1001rp DC server to power Connect the DC power cable to the server, as shown belowTo start the server Binder Installing the server and connecting the peripheral devices Index Clan Elan May Index Index Page Product release Document release Standard Date May