May 2003 | Power supply installation |
11Select a #10 green wire safety ground and attach it to the cabinet.
12Measure the module ground continuity by touching one multimeter lead to any BATRTN terminal block connector and the other end to the GND terminal block connector.
The measurement should be between
Part 2: 1001rp Server Hardware Installation | 51 |