October 2006 | Preparing for installation |
IF | THEN |
you are satisfied that the 1002rp server has arrived at your site undamaged
replace the server cover and proceed with the hardware installation.
See “Installation checklist” on page 34.
Note: Do not reinstall the front bezel until the server is in its final location and the CallPilot installation is complete.
1002rp Server Hardware Installation | 43 |