Nortel Networks 1002rp manual

Page 85
Image 85
Contents 1002rp Server Hardware Installation Copyright 2006 Nortel Networks 1002rp Server Hardware Installation Information for Japan があります。この場合には使用者が適切な対策を取るように要求されることがあ ります。 Standard Publication history Publication history To connect the mouse, keyboard, and monitor to the server Task ListTask List Contents EMC emission level protection for the 1002rp Server Index Getting Help over the phone from a Nortel Solutions Center How to get HelpA p t e r Getting Help from the Nortel Web siteGetting Help through a Nortel distributor or reseller This chapter 1002rp server descriptionServer dimensions and weight Server featuresIntroduction Environmental specifications Alarm board Front panel features front view without the front bezelRear panel diagram Overhead view of empty server showing PCI and ISA connectors Slot definition and slot numbering Slot assignments1002rp slot assignments BRD13 1002rp server description Network connectivity Sample network setup Meridian CE-MUX Sample network setup SuccessionCallPilot Elan and Clan network setup Switch connectivityNetwork requirements Remote access connectivityModem Kbit/s external modem NTRH9078 provides Supported peripheral devicesCallPilot Customer Documentation Map Reference documents1002rp server description Preparing for installation Installation checklist Installation overviewOctober 2006Preparing for installation Conventions for warnings To unpack the equipment Unpacking the 1002rp serverWhat’s next? Removing the front bezel and server cover To remove the front bezel To remove the server cover To inspect the server interior Inspecting the server interiorOctober To replace the front bezel after installation is complete Power supply installation Safety information Safety precautionsEquipment handling guidelines About the power supply module Installing the second power supply module AC or DCAC versus DC systems Power supply modules To install the power supply module DC wire gauge tables Metric wire conversion DC rack cabling Rack power and grounding DC power distribution rationale PDU power and grounding About the power distribution unitMultiple PDUs DC power input PDU terminal blocks and wiring diagramTo bring DC power and ground into the PDU Bringing power and ground into the PDUPower supply installation Installing the server and connecting the peripheral devices To install the server Installing the serverRequired equipment Preparing the modemDIP Modem DIP switchesOFF To set the modem DIP switchesCarrier Detect CD override Rear panel connectors Connecting peripherals to the serverTo connect the modem to the server To connect the mouse, keyboard, and monitor to the serverContinue with Connecting the server to the Elan on Media Access Control address Connecting the server to the ElanTo connect the server to the Elan 555-7101-210 If the server will To connect the server to the Clan Connecting the server to the Clan optionalInstalling the server and connecting the peripheral devices Installing the Nortel software feature dongle Requirements To install the software feature dongleBefore you begin Connecting the server to powerCallPilot Server To connect the 1002rp DC server to power To connect the 1002rp AC server to powerTo start the server P e n d i x a EMC emission level protection for the 1002rp ServerFerrites secured to an external cable Numerics IndexIndex October Index Index Page 1002rp Server Hardware Installation