Nortel Networks 1002rp manual To install the software feature dongle, Requirements

Page 74

Installing the server and connecting the peripheral devices

Standard 1.07

Requirements

For installation, you require a Phillips No. 1 screwdriver.

To install the software feature dongle

1Ensure that there is no cable connected to the parallel port.

Note: The parallel port is also known as the printer port or LPT1. It is located at the back of the server. See the diagram on page 65.

2If the software feature key is not preinstalled in the dongle, remove it from the plastic bag, and carefully insert it into the software feature slot on the dongle. Make sure that the clips secure it properly and that the Nortel logo faces outwards.

3Plug the male end of the adapter into the parallel port.

4Tighten the connector screws.

What’s next?

Continue with “Connecting the server to power” on page 75.

74

CallPilot

Image 74
Contents 1002rp Server Hardware Installation Copyright 2006 Nortel Networks 1002rp Server Hardware Installation Information for Japan があります。この場合には使用者が適切な対策を取るように要求されることがあ ります。 Standard Publication history Publication history Task List To connect the mouse, keyboard, and monitor to the serverTask List Contents EMC emission level protection for the 1002rp Server Index A p t e r How to get HelpGetting Help over the phone from a Nortel Solutions Center Getting Help from the Nortel Web siteGetting Help through a Nortel distributor or reseller 1002rp server description This chapterIntroduction Server featuresServer dimensions and weight Environmental specifications Front panel features front view without the front bezel Alarm boardRear panel diagram Overhead view of empty server showing PCI and ISA connectors Slot assignments Slot definition and slot numbering1002rp slot assignments BRD13 1002rp server description Network connectivity Sample network setup Meridian Sample network setup Succession CE-MUXSwitch connectivity CallPilot Elan and Clan network setupRemote access connectivity Network requirementsSupported peripheral devices Modem Kbit/s external modem NTRH9078 providesReference documents CallPilot Customer Documentation Map1002rp server description Preparing for installation Installation overview Installation checklistOctober 2006Preparing for installation Conventions for warnings Unpacking the 1002rp server To unpack the equipmentWhat’s next? Removing the front bezel and server cover To remove the front bezel To remove the server cover Inspecting the server interior To inspect the server interiorOctober To replace the front bezel after installation is complete Power supply installation Equipment handling guidelines Safety precautionsSafety information AC versus DC systems Installing the second power supply module AC or DCAbout the power supply module Power supply modules To install the power supply module DC wire gauge tables Metric wire conversion DC rack cabling Rack power and grounding DC power distribution rationale Multiple PDUs About the power distribution unitPDU power and grounding PDU terminal blocks and wiring diagram DC power inputBringing power and ground into the PDU To bring DC power and ground into the PDUPower supply installation Installing the server and connecting the peripheral devices Installing the server To install the serverPreparing the modem Required equipmentModem DIP switches DIPTo set the modem DIP switches OFFCarrier Detect CD override Connecting peripherals to the server Rear panel connectorsTo connect the mouse, keyboard, and monitor to the server To connect the modem to the serverContinue with Connecting the server to the Elan on To connect the server to the Elan Connecting the server to the ElanMedia Access Control address 555-7101-210 If the server will Connecting the server to the Clan optional To connect the server to the ClanInstalling the server and connecting the peripheral devices Installing the Nortel software feature dongle To install the software feature dongle RequirementsConnecting the server to power Before you beginCallPilot Server To connect the 1002rp AC server to power To connect the 1002rp DC server to powerTo start the server EMC emission level protection for the 1002rp Server P e n d i x aFerrites secured to an external cable Index NumericsIndex October Index Index Page 1002rp Server Hardware Installation