Nortel Networks 1002rp Safety precautions, Equipment handling guidelines, Safety information

Page 46

Power supply installation

Standard 1.07

Safety precautions

Equipment handling guidelines

External power equipment, such as an uninterruptible power supply (UPS), is usually very heavy. This equipment requires special handling procedures and additional personnel for unloading and installation. Be aware of weight distribution, and prevent the equipment room floor from being overly stressed.

Safety information

In DC systems, locate the service panel near the entry to the room containing the DC power system that supplies the server.

DANGER

Risk of electric shock

Procedures involving electrical connections must be performed only by qualified personnel.

Ensure that you obey all displayed warning notices on power equipment and connections.

46

CallPilot

Image 46
Contents 1002rp Server Hardware Installation Copyright 2006 Nortel Networks 1002rp Server Hardware Installation Information for Japan があります。この場合には使用者が適切な対策を取るように要求されることがあ ります。 Standard Publication history Publication history Task List To connect the mouse, keyboard, and monitor to the serverTask List Contents EMC emission level protection for the 1002rp Server Index A p t e r How to get HelpGetting Help over the phone from a Nortel Solutions Center Getting Help from the Nortel Web siteGetting Help through a Nortel distributor or reseller 1002rp server description This chapterServer dimensions and weight Server featuresIntroduction Environmental specifications Front panel features front view without the front bezel Alarm boardRear panel diagram Overhead view of empty server showing PCI and ISA connectors Slot assignments Slot definition and slot numbering1002rp slot assignments BRD13 1002rp server description Network connectivity Sample network setup Meridian Sample network setup Succession CE-MUXSwitch connectivity CallPilot Elan and Clan network setupRemote access connectivity Network requirementsSupported peripheral devices Modem Kbit/s external modem NTRH9078 providesReference documents CallPilot Customer Documentation Map1002rp server description Preparing for installation Installation overview Installation checklistOctober 2006Preparing for installation Conventions for warnings Unpacking the 1002rp server To unpack the equipmentWhat’s next? Removing the front bezel and server cover To remove the front bezel To remove the server cover Inspecting the server interior To inspect the server interiorOctober To replace the front bezel after installation is complete Power supply installation Safety information Safety precautionsEquipment handling guidelines About the power supply module Installing the second power supply module AC or DCAC versus DC systems Power supply modules To install the power supply module DC wire gauge tables Metric wire conversion DC rack cabling Rack power and grounding DC power distribution rationale PDU power and grounding About the power distribution unitMultiple PDUs PDU terminal blocks and wiring diagram DC power inputBringing power and ground into the PDU To bring DC power and ground into the PDUPower supply installation Installing the server and connecting the peripheral devices Installing the server To install the serverPreparing the modem Required equipmentModem DIP switches DIPTo set the modem DIP switches OFFCarrier Detect CD override Connecting peripherals to the server Rear panel connectorsTo connect the mouse, keyboard, and monitor to the server To connect the modem to the serverContinue with Connecting the server to the Elan on Media Access Control address Connecting the server to the ElanTo connect the server to the Elan 555-7101-210 If the server will Connecting the server to the Clan optional To connect the server to the ClanInstalling the server and connecting the peripheral devices Installing the Nortel software feature dongle To install the software feature dongle RequirementsConnecting the server to power Before you beginCallPilot Server To connect the 1002rp AC server to power To connect the 1002rp DC server to powerTo start the server EMC emission level protection for the 1002rp Server P e n d i x aFerrites secured to an external cable Index NumericsIndex October Index Index Page 1002rp Server Hardware Installation