American Power Conversion MX06 50, MX06 100 user manual Table of Contents

Page 2

 

 

 

 

Table of Contents

 

1

Safety First!

1

 

 

1.1.

 

WARNING SYMBOLS

1

1.2.

 

GENERAL PRECAUTIONS:

1

2

Introduction

2

 

 

2.1.

 

GENERAL INFORMATION

2

2.2.

HOW TO USE THIS MANUAL

4

3

Installation

5

 

 

3.1.

 

UNPACKING EQUIPMENT

5

3.2.

 

MECHANICAL INSTALLATION

5

Room / Location

......................................................................................................................

5

Mounting

 

5

Ventilation

 

6

3.3.

 

AC POWER CONNECTIONS

6

3.4.

 

BATTERY CONNECTIONS

7

Planning the Battery installation

7

Connecting the Battery Cables

7

Battery LVD Connection

8

Multiple Battery Strings

8

Battery Temperature Probe Installation

10

3.5.

 

DC SYSTEM GROUNDING

10

3.6.

 

LOAD PROTECTION INSTALLATION

11

Circuit Breaker Installation

11

GMT Fuse Installation

11

3.7.

 

LOAD CONNECTIONS

12

Cable Size Considerations

12

Circuit Breaker Protected Load Connections (30 or 60 Amps)

12

GMT Fuse protected Load Connections

13

3.8.

 

INPUT / OUTPUT CONNECTIONS

13

Relay Output Connections

13

External Alarm Input Connections

14

3.9.

 

RECTIFIER MODULE INSTALLATION

15

3.10.

INITIAL POWER-UP AND CHECKOUT

15

3.11.

BATTERY AND LOAD POWER UP

16

4

Technical Description

17

 

4.1.

 

RECTIFIER MANAGEMENT

17

AC Input Power

 

17

DC Output Power

17

System Output Capacity

17

Rectifier alarms reporting

17

4.2.

 

SYSTEM MANAGEMENT

18

Control Functions

18

Alarm Functions

 

18

Displays

 

18

MX06 Power Plant User’s Manual

 

Page ii

Image 2
Contents VDC Power Systems Table of Contents APC Worldwide Customer Support Limited Product Warranty Revision History RevisionSafety First General PrecautionsIntroduction General InformationPort How to Use This Manual Unpacking Equipment InstallationMechanical Installation Room / LocationAC Power Connections VentilationConnecting the Battery Cables Battery ConnectionsPlanning the Battery installation Battery LVD Connection Multiple Battery StringsBattery LVD Battery Temperature Probe Installation DC System GroundingGMT Fuse Installation Load Protection InstallationCircuit Breaker Installation Circuit Breaker Protected Load Connections 30 or 60 Amps Load ConnectionsCable Size Considerations Relay Output Connections Input / Output ConnectionsGMT Fuse protected Load Connections Relay J2 Connector Output Relay Notes Designations External Alarm Input ConnectionsRectifier Module Installation Initial Power-Up and CheckoutBattery and Load Power up Technical Description Rectifier ManagementControl Functions Alarm FunctionsSystem Management DisplaysBattery Temperature Compensation Battery ManagementBattery Charging Load ManagementBattery Low Voltage Disconnect Description MX06 Voltage AdjustmentsOperation MX06 OperationAlarm No Setting NC Setting Major Minor Factory MX06-50 Configuration SettingsMX06 External Alarm Input Configuration Alarm MX06-50 Rectifier ConfigurationMX06-50 Programmable Alarms Major Minor No Alarm FactoryMX06-100 Rectifier Configuration MX06-100 Configuration SettingsMX06-50 Temperature Probe Selection MX06-100 Programmable Alarms MX06-100 Temperature Probe SelectionAC Input SpecificationsMX06 50 Power System TWF0500H5401 RectifierMX06 100 Power System DC OutputVDC MX06 Controller Controls and IndicatorsMechanical Environmental Magnum VS 50 Power SystemMagnum VS 100 Power System Compliance EMCAPC Worldwide Customer Support Limited Product Warranty