American Power Conversion MX06 50, MX06 100 Relay J2 Connector Output Relay Notes Designations

Page 18

 

RELAY

 

J2 CONNECTOR

 

OUTPUT RELAY NOTES

 

OUTPUT

 

DESIGNATIONS

 

 

 

 

NC

1

 

 

 

MAJOR

C

2

 

 

 

 

NO

3

 

 

 

 

NC

4

 

 

 

MINOR

C

5

 

 

 

 

NO

6

 

 

 

 

NC

7

 

 

 

VERY LOW V

C

8

 

 

 

 

NO

9

 

 

Figure 3.8-1 Output Relay Connections

External Alarm Input Connections

Four user-defined alarm inputs are provided on connector J3. Each alarm input can be individually programmed for alarm priority (MAJOR or MINOR) and input contact configuration (Normally Open or Normally Closed). Each alarm input utilizes a two wire connection, with one side of the contact attached to user input pin and the other side connected to one of the –BAT pins. The input alarm contacts must be isolated (“dry”).

The factory default settings for these alarms are MAJOR alarm priority and a Normally Open (NO) contact input, closed for alarm. Changing the contact input to Normally Closed or programming an alarm condition for MINOR requires a change to dipswitch S1 mounted on the system Controller Board. See application details in Section 5.

A cable (0W09051) is available to connect the input alarms. Refer to Figure 3.7-2 for rear panel connections.

EXTERNAL ALARM

J3 CONNECTOR

USER ALARM NOTES

INPUT

DESIGNATIONS

 

#1

1

 

#2

2

 

#3

4

 

#4

5

 

#1 C

6

 

#2 C

7

 

#3 C

9

 

#4 C

10

 

Figure 3.8-2 External User Input Connections

MX06 Power Plant User’s Manual

Page 14

Image 18
Contents VDC Power Systems Table of Contents APC Worldwide Customer Support Limited Product Warranty Revision History RevisionSafety First General PrecautionsIntroduction General InformationPort How to Use This Manual Unpacking Equipment InstallationMechanical Installation Room / LocationAC Power Connections VentilationBattery Connections Planning the Battery installationConnecting the Battery Cables Battery LVD Connection Multiple Battery StringsBattery LVD Battery Temperature Probe Installation DC System Grounding Load Protection Installation Circuit Breaker Installation GMT Fuse Installation Load Connections Cable Size ConsiderationsCircuit Breaker Protected Load Connections 30 or 60 Amps Input / Output Connections GMT Fuse protected Load ConnectionsRelay Output Connections Relay J2 Connector Output Relay Notes Designations External Alarm Input ConnectionsRectifier Module Installation Initial Power-Up and CheckoutBattery and Load Power up Technical Description Rectifier ManagementControl Functions Alarm FunctionsSystem Management DisplaysBattery Temperature Compensation Battery ManagementBattery Charging Load ManagementBattery Low Voltage Disconnect Description MX06 Voltage AdjustmentsOperation MX06 OperationMX06-50 Configuration Settings MX06 External Alarm Input ConfigurationAlarm No Setting NC Setting Major Minor Factory Alarm MX06-50 Rectifier ConfigurationMX06-50 Programmable Alarms Major Minor No Alarm FactoryMX06-100 Configuration Settings MX06-50 Temperature Probe SelectionMX06-100 Rectifier Configuration MX06-100 Programmable Alarms MX06-100 Temperature Probe SelectionAC Input SpecificationsMX06 50 Power System TWF0500H5401 RectifierMX06 100 Power System DC OutputVDC Controls and Indicators MechanicalMX06 Controller Magnum VS 50 Power System Magnum VS 100 Power SystemEnvironmental Compliance EMCAPC Worldwide Customer Support Limited Product Warranty