MX06-50 Temperature Probe Selection

Temperature compensation can be configured for either a Fahrenheit or Celsius probe by the use of configuration jumpers on pin header J4 shown in Figure 5.3-1. The MX06-50 is factory set for Fahrenheit operation, with jumpers on all position of J4.

5.4. MX06-100 Configuration Settings

The control card for the MX06-50 is different than the control card for the MX06-100 due to increased number of rectifiers in the MX06-100. The control card for the MX06 is the 0P9172 and for the MX06-100, the control card is the 0P9745. This section will deal with configurations applicable to the MX06-100 only.

 

 

 

 

 

 

GND

 

 

V-ADJ

 

 

 

 

 

E1

 

 

E8

 

 

 

 

 

 

 

 

BATT ALM GMT ALM

 

 

 

 

 

 

 

 

J4

J7

 

 

Factory Set. Do not touch.

 

J5

J8

 

 

 

J6

J9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(SEE MANUAL)

J1

K1

RECT SELECT

 

 

 

 

 

S2

 

ON: RECTIFIER NOT INSTALLED

 

 

 

 

 

 

OFF: RECTIFIER INSTALLED

 

 

 

1

 

 

 

10

 

 

 

 

 

 

 

RECT NUMBER

 

 

 

 

 

K4

 

K2

K3

 

 

 

 

 

 

 

 

R105

 

R106

 

R102

 

R103

R104

 

 

 

 

 

 

 

 

E12

DISCON LEV ADJ

E9

L V ALARM

 

 

E13

 

 

 

E10

E11

 

 

RECON LEV ADJ

 

 

H V ALARM

 

VLV ALARM

NO\NC

 

INPUT

DC GOOD

USER ALM

MAJOR

1

 

 

MINOR

8

LOW V

MAJ/MIN

SELECTVLV

OFFON

E101 +BAT

E102 -BAT

R101 V ADJ

Figure 5.4-1 MX06-100 Controller Layout

MX06-100 Rectifier Configuration

The system Controller Board must know if a rectifier is present for each of the five slots. This is done by the properly setting the dipswitch S2 (“RECT PRESENT”) on the Controller Board. If a rectifier is not present in a given slot, the corresponding switch position must be set to the “ON” condition. The ON direction is labeled on the body of the dipswitch. Figure 5.4-1 locates switch S2 on the PC board.

MX06 Power Plant User’s Manual

Page 24

Image 28
Contents VDC Power Systems Table of Contents APC Worldwide Customer Support Limited Product Warranty Revision History RevisionSafety First General PrecautionsIntroduction General InformationPort How to Use This Manual Installation Mechanical InstallationUnpacking Equipment Room / LocationAC Power Connections VentilationPlanning the Battery installation Battery ConnectionsConnecting the Battery Cables Battery LVD Connection Multiple Battery StringsBattery LVD Battery Temperature Probe Installation DC System GroundingCircuit Breaker Installation Load Protection InstallationGMT Fuse Installation Cable Size Considerations Load ConnectionsCircuit Breaker Protected Load Connections 30 or 60 Amps GMT Fuse protected Load Connections Input / Output ConnectionsRelay Output Connections Relay J2 Connector Output Relay Notes Designations External Alarm Input ConnectionsRectifier Module Installation Initial Power-Up and CheckoutBattery and Load Power up Technical Description Rectifier ManagementAlarm Functions System ManagementControl Functions DisplaysBattery Management Battery ChargingBattery Temperature Compensation Load ManagementBattery Low Voltage Disconnect MX06 Voltage Adjustments OperationDescription MX06 OperationMX06 External Alarm Input Configuration MX06-50 Configuration SettingsAlarm No Setting NC Setting Major Minor Factory MX06-50 Rectifier Configuration MX06-50 Programmable AlarmsAlarm Major Minor No Alarm FactoryMX06-50 Temperature Probe Selection MX06-100 Configuration SettingsMX06-100 Rectifier Configuration MX06-100 Programmable Alarms MX06-100 Temperature Probe SelectionSpecifications MX06 50 Power SystemAC Input TWF0500H5401 RectifierMX06 100 Power System DC OutputVDC Mechanical Controls and IndicatorsMX06 Controller Magnum VS 100 Power System Magnum VS 50 Power SystemEnvironmental Compliance EMCAPC Worldwide Customer Support Limited Product Warranty