American Power Conversion AP9604S manual Battery Monitor, Programming example

Page 40

Programming Parameters

5.3.2 Programming example

Example with four systems in parallel with separate batteries.

Programme the station addresses 1-4: 1 for UPS 1, 2 for UPS 2, 3 for UPS 3, and 4 for UPS 4.

All UPS systems have to be programmed to “Highest station address”:4.

If APM is not to be tested, “APM test mode active” must be “NO”.

If a system is isolated due to service, the station numbers must be reprogrammed for the remaining active systems starting with number 1 and ending with maximum. number of active systems. No number must be left in this sequence. Furthermore, “Highest station address” must be changed to number of active UPSs in parallel.

5.4Battery Monitor

990-4056

40

Installation Guide APC Silcon 240-320kW 400V UPS

Image 40
Contents 240-320kW 400V UPS Installation Guide Safety Symbols used in this manual Installation Guide APC Silcon 240-320kW 400V UPSThank You Introduction IntroductionTools and Equipment ToolsUnpacking UnpackingInstallation InstallationRequirements on Site Height mm Width mm Depth mmFootprint 2 825mm Cabinet for Isolation Transformer or Switch Gear1 1600mm Cabinet for 240-320kW UPS 3 1600mm Cabinet for 320kW Isolation Transformer Connecting the UPS External ConnectionExternal Connection Right side viewExternal External PE Maximum Input Cable ExternalFuses* FM OutputSystem Integration Interface Connections Terminal Blocks X003/X004 Anxiliary Contacts X005 Output RelaysParallel Board Parallel BoardPower Cables External Control CablesRelay Board RelaysRelay Number Message Alarm-trigging Events Relay Board/Relay FunctionsSee .2 System configuration Communication Interface Board Connecting of APC Silcon Tripel Chassis Safety Warnings APC Silcon Triple ChassisProduct Description Monitoring PortOptional Power Input Installing Management PeripheralsLEDs If the LED is… Then the Silcon Triple Chassis…Installing Management Peripheral Cards Order of Management Peripheral CardsManagement Peripheral Priority Position Card Daisy-chaining the APC Silcon Triple ChassisManagement Peripheral Draw mA Problem Possible Cause Solution TroubleshootingIf Problems Persist Product Specifications Monitoring Port Pin Assignments External Connection Power, Physical, and Environmental Specifications SpecificationAPC Silcon Battery Cabinets Important Safety InstructionsInstallation of Batteries Battery Breaker Box/Fuse-boxSilcon Battery Breaker Box Ampere Connection Max Dimensions Weight Rating Cable APC Battery Breaker Box Connection Diagram 120-480kWHxWxD mm CircuitExternal Connection Parameter Setting Comments Programming ParametersProgramming Parameters ParametersProgramming Keys System Configuration Programming Example Switch to Bypass OperationSystem Configuration Parameters password protected Programming Example Change Charge Voltage to Programming Parameters Description of Settings Programming Parameters for Advanced Parallel OperationBattery Monitor Programming exampleProgramming Parameters Options/Accessories Options/AccessoriesService Bypass Panel for Single Operation Options/Accessories On Service Bypass Panel ActionDisplay shows Lamp indicationSwitching from External Bypass to Normal UPS Operation Lamp indication On Servive Bypass PanelService Bypass Panel for Parallel Redundant Operation Two Parallel Systems with Service Bypass Panel Options/Accessories Options/Accessories Display shows H002a Lamp indication On Service Bypass Panel Following can be carried out on any UPS Isolating One UPS for Service/Maintenance Switching Back to Normal Parallel/Redundant OperationIntersystem Synchronization Unit System ISU System Intersystem Synchronization UnitIntersystem Synchronization Unit ISU Extension of Remote Display Communication Distance Remote DisplayStandard Short-haul RS232 Modem Async Connections Without Converter Host DTE Remote Display DTEConnections With Converter Pin Connections for cable from host to ME800A-R2 HostRemote Display Power Supply Remote Display CablesCommunication Fault Remote Display SettingAlarms Remote Display UseIsolation Transformer Height Width Depth WeightIsolation Example of Transformer Configuration Yyno Connecting Isolation Transformer PE Cable370kW 630 200 150Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories System Specifications System SpecificationsTechnical Data Dimensions / WeightWarranty WarrantyAPC Silcon Series Limited Factory Warranty Appendix Installation Planning DataAppendix Appendix How to Contact APC How to Contact APCAPC Corporate APC Denmark