American Power Conversion AP9604S External External PE Maximum, Input Cable External, Fuses* FM

Page 9

External Connection

UPS

External

External

External PE

Maximum

External

 

Input

Input Cable

Cable

External

Output Cable

 

Fuses* FM

[mm2]

[mm2]

Output

[mm2]

 

[A]

380-415V

 

Fuses*

 

 

380-415V

 

 

[A]

 

 

 

 

 

 

 

240kW

500

2//125

100

400

2//100

 

 

 

 

 

 

320kW

630

2//200

150

500

2//150

 

 

 

 

 

 

* DIN gL types

NOTICE!

All cable dimensions are recommended sizes only.

Refer to local legal regulations.

UPS

External Alarm

External System

External Battery

External Battery

 

Cable max.

Earth Cable

Breaker

Cable [mm2]

 

[mm2]

[mm2]**

[A]

 

 

 

 

 

 

240kW

2

30

400

2//100

 

 

 

 

 

320kW

2

30

500

2//150

 

 

 

 

 

PVC cables insulated to withstand ambient temperature of max. 30°C

** Must be rated as external PE cable if mains system is not supplying PE

NOTICE!

Install gland plate in bottom of unit.

 

990-4056

 

 

Installation Guide APC Silcon 240-320kW 400V UPS

9

Image 9
Contents 240-320kW 400V UPS Installation Guide Installation Guide APC Silcon 240-320kW 400V UPS Safety Symbols used in this manualThank You Introduction IntroductionTools and Equipment ToolsUnpacking UnpackingInstallation InstallationRequirements on Site Height mm Width mm Depth mm2 825mm Cabinet for Isolation Transformer or Switch Gear Footprint1 1600mm Cabinet for 240-320kW UPS 3 1600mm Cabinet for 320kW Isolation Transformer External Connection Connecting the UPSExternal Connection Right side viewInput Cable External External External PE MaximumFuses* FM OutputSystem Integration Interface Connections X005 Output Relays Terminal Blocks X003/X004 Anxiliary ContactsParallel Board Parallel BoardExternal Control Cables Power CablesRelays Relay BoardRelay Board/Relay Functions Relay Number Message Alarm-trigging EventsSee .2 System configuration Communication Interface Board Connecting of APC Silcon Tripel Chassis APC Silcon Triple Chassis Safety WarningsProduct Description Monitoring PortInstalling Management Peripherals Optional Power InputLEDs If the LED is… Then the Silcon Triple Chassis…Order of Management Peripheral Cards Installing Management Peripheral CardsManagement Peripheral Priority Position Card Daisy-chaining the APC Silcon Triple ChassisManagement Peripheral Draw mA Troubleshooting Problem Possible Cause SolutionIf Problems Persist Product Specifications Monitoring Port Pin Assignments External Connection Specification Power, Physical, and Environmental SpecificationsImportant Safety Instructions APC Silcon Battery CabinetsBattery Breaker Box/Fuse-box Installation of BatteriesSilcon Battery Breaker Box APC Battery Breaker Box Connection Diagram 120-480kW Ampere Connection Max Dimensions Weight Rating CableHxWxD mm CircuitExternal Connection Programming Parameters Parameter Setting CommentsProgramming Parameters ParametersProgramming Keys Programming Example Switch to Bypass Operation System ConfigurationSystem Configuration Parameters password protected Programming Example Change Charge Voltage to Programming Parameters Programming Parameters for Advanced Parallel Operation Description of SettingsProgramming example Battery MonitorProgramming Parameters Options/Accessories Options/AccessoriesService Bypass Panel for Single Operation Options/Accessories Action On Service Bypass PanelDisplay shows Lamp indicationLamp indication On Servive Bypass Panel Switching from External Bypass to Normal UPS OperationService Bypass Panel for Parallel Redundant Operation Two Parallel Systems with Service Bypass Panel Options/Accessories Options/Accessories Display shows H002a Lamp indication On Service Bypass Panel Following can be carried out on any UPS Switching Back to Normal Parallel/Redundant Operation Isolating One UPS for Service/MaintenanceIntersystem Synchronization Unit Intersystem Synchronization Unit System ISU SystemIntersystem Synchronization Unit ISU Remote Display Extension of Remote Display Communication DistanceStandard Short-haul RS232 Modem Async Host DTE Remote Display DTE Connections Without ConverterConnections With Converter Pin Connections for cable from host to ME800A-R2 HostRemote Display Cables Remote Display Power SupplyRemote Display Setting Communication FaultAlarms Remote Display UseHeight Width Depth Weight Isolation TransformerIsolation Example of Transformer Configuration Yyno PE Cable Connecting Isolation Transformer370kW 630 200 150Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories Options/Accessories System Specifications System SpecificationsTechnical Data Dimensions / WeightWarranty WarrantyAPC Silcon Series Limited Factory Warranty Installation Planning Data AppendixAppendix Appendix How to Contact APC How to Contact APCAPC Corporate APC Denmark